![Elnur CM15BG Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/elnur/cm15bg/cm15bg_installation-instructions-and-user-manual_2395143010.webp)
9
Typical Discharge Pipe terminations
(source: Building Regulation G3) :
All installations must be fitted in accordance with all local regulations in force at that time. Failure to comply with
these regulations will invalidate the manufacturers’ warranty.
4.9 PUMP DUTY
Boiler equipped with a high efficiency circulation pump, with a maximum impulsion height of 6.2 m and a maximum
flow of 3.3 m³ / h.
There are selectable operation modes with the built-in knob. You can select constant operating speeds I, II and III.
A LED indicator informs about the operating status of the pump
-
Green: correct operation.
-
Green / red flashing: Lower voltage U<180V; overvoltage U>253V; Module overheating
-
Red flashing: pump blocked.
4.10 ELECTRICAL CONNECTIONS
Connection to Mains Supply
The CM15BG and CMX15BG boilers must be installed in premises having a system impedance of not
more than 0.25 + j0.25
Ω
.
The CM15BG and CMX15BG boilers comply with the technical requirements of BS EN 61000-3-3.
The CM15BG and CMX15BG boilers must be installed in premises having a service capacity
≥
100 A per phase.
Complete all the pipe-work before connecting the boiler to the electricity supply.
Any re-installation must be performed by qualified electricians.
Ensure that the mains voltage available coincides with that shown on the rating label.
WARNING
IMPORTANT: CHECK THAT THE TOTAL POWER SUPPLY TO THE BUILDING HAS
SUFFICIENT LOAD CAPACITY TO SUPPLY THE BOILER AT THE HEAT OUTPUT REQUIRED IN ADDITION
TO ALL OTHER APPLIANCES THAT MAY BE SUPPLIED.
WARNING
THE SUPPLY CABLE TO THE BOILER SHOULD BE OF SUFFICIENT SIZE TO CARRY THE
LOAD CAPACITY REQUIRED. IT SHOULD BE WIRED THROUGH A LINKED ISOLATOR SWITCH WITH
Содержание CM15BG
Страница 22: ...21 NOTES...
Страница 23: ...22 13 WIRING DIAGRAMS...