Elnur CM15BG Скачать руководство пользователя страница 2

INDEX 

1 IMPORTANT

 

 

 

 

 

2 SAFETY

 

 

 

 

 

1

 

 

3 INTRODUCTION

   

 

 

3.1 DESIGN & OPERATION  

 

 

3.2 PRINCIPLE COMPONENTS    

 

3.3 KEY TO COMPONENTS  

 

 

3.4 SAFETY DEVICES  

 

 

 

 

4 INSTALLATION

 

 

 

 

4.1 GENERAL REQUIREMENTS    

 

4.2 UNPACKING & CONTENTS   

 

4.3 

LOCATION 

 

    5 

4.4 DIMENSIONS & CONNECTIONS  

 

4.5 

CLEARANCES    6 

4.6 MOUNTING BRACKET   

 

 

4.7 WATER CONNECTIONS      

 

4.8 DHW DISCHARGE PIPE-WORK    

 

4.9 PUMP DUTY  

 

 

 

 9 

4.10 ELECTRICAL CONNECTIONS 

 

 9 

 

5COMMISIONING

 

 

 

 

11 

5.1 LIMITING BOILER MAXIMUM OUTPUT 

11 

5.2 HEATING SYSTEM INITIAL FILLING    

12 

5.3 PUMP CHECKING & VENTING  

 

12 

5.4 HEATING SYSTEM FLUSHING  

 

13 

5.5 FILLING DOMESTIC HOT WATER    

13 

 
6 OPERATING THE BOILER

   

 

13 

6.1 INITIAL SWITCHING ON    

 

13 

6.2 CONTROL PANEL DESCRIPTION    

13 

6.3 DHW OPERATION    

 

14 

6.4 CENTRAL HEATING OPERATION    

15 

6.5 ANTI-FREEZE MODE  

 

 

15 

6.6 HEATING MODULATION FEATURE   

15 

6.7 LOCKING THE CONTROL PANEL    

15 

6.8 PUMP ANTI-SEIZE FUNCTION  

 

15 

 

7TROUBLESHOOTING 

 

 

 

16 

7.1 POSSIBLE FAULTS & SOLUTIONS  

 

16 

7.2 OVERHEAT LOCK-OUT & RE-SETTING 

17 

7.3 HEATING FLOW SWITCH – E3 ERROR 

17 

7.4 CHECKING RATED HEAT OUTPUT    

17 

 

8 MAIN COMPONENTS LIST

 

 

18 

 
9MAINTENANCE & CARE 

   

 

18

 

 

10 ENVIRONMENTAL INFORMATION

 

18

 

 
11TECHNICAL DATA

 

 

 

19 

 
12 EC DECLARATION OF CONFORMITY

  20 

 

13 WIRING DIAGRAMS 

 

 

 

22 

 
 

1 IMPORTANT 

The following installation instructions are intended to guide 
the competent person throughout the entire installation 
process. 
 
The boiler’s guarantee does not cover any damaged caused 
by non-observance of any of these instructions. 
 
These installation instructions and user’s guide must be 
conserved and given to any new user. 
 
The symbols used in the text are explained below: 

 WARNING   This indication shows the possibility 

of causing death from electric shock. 

 WARNING   This indication shows the possibility 

of causing death or serious injury. 

 CAUTION 

This indication shows the possibility 
of causing injury or damage to 
properties only. 

 

Symbol for useful information. 

 
 
 
 

 

2 SAFETY 

o

 

This appliance is not destined for use by anyone 
(including children) with reduced physical, sensorial 
or mental capacities or those who do not know 
how to use the appliance, unless they are 
supervised or instructed by a person responsible 
for their safety. 

o

 

Check that the voltage on the indicator plate of the 
boiler coincides with the voltage of the mains 
circuit to which it is going to be connected. 

o

 

The use of these boilers in the presence of gases, 
explosives or inflammable objects is prohibited. 

o

 

The air inputs and outputs of the boiler ensure its 
correct operation and protect it from over-heating. 
They must never be covered. 

o

 

This boiler must be disconnected from the mains 
electricity before carrying out any internal repairs. 

o

 

The boiler must be installed in such a manner that 
the switches or other controls cannot be touched 
by anyone who is using the bath or shower. 

o

 

The installation must be performed in accordance 
with current electricity regulations. 

o

 

This appliance is destined to be permanently 
connected to a fixed installation. The power circuit 
of the boiler must incorporate an omni-polar cut-
off switch with a separation between the contacts 
of at least 3 mm. 

o

 

The electricity supply circuit must incorporate a 
Residual-Current Device. 

o

 

This boiler must be earthed.  

i

Содержание CM15BG

Страница 1: ...must be followed for the safe installation of the boiler Any problem fault or damage caused by the non observance ofthese instructions will not be covered under the manufacturer s warranty This manual...

Страница 2: ...rved and given to any new user The symbols used in the text are explained below WARNING This indication shows the possibility of causing death from electric shock WARNING This indication shows the pos...

Страница 3: ...he hot water supply to ensure a safe and economic supply of hot water All components for sealed system central heating are built in A suitable filling loop should be fitted externally to comply with w...

Страница 4: ...nts before commencing SITING THE BOILER WARNINGWall and fixings must be suitable to support the total weight CMX boiler when full is 120 kg CM boiler when full is 50 kg Allow sufficient clearance and...

Страница 5: ...current building regulations Installation should also be in accordance with the relevant British Standards and Codes of Practice including the following BS 5449 Forced circulation hot water systems BS...

Страница 6: ...r splashing onto the boiler or controls Electrical safety regulations for clearances must be followed if installed in a bathroom or shower area The boiler has an electric protection rating of IP20 IP2...

Страница 7: ...to enable easy access for servicing Ensure sufficient space to make all water connections including the outlet pipes for the heating and hot water safety valves which should be routed to a suitable d...

Страница 8: ...able caps Heating Flow Return These connections are for connection to 22mm pipe using the tails provided Service valves should be installed at this position to allow the boiler to be isolated for main...

Страница 9: ...d with a continuous fall to a safe yet visible point where any discharge cannot cause damage or injury 4 8 DHW DISCHARGE PIPE WORK The CMX electric combi boiler range incorporates a 50 L unvented hot...

Страница 10: ...ection to Mains Supply The CM15BG and CMX15BG boilers must be installed in premises having a system impedance of not more than 0 25 j0 25 The CM15BG and CMX15BG boilers comply with the technical requi...

Страница 11: ...the connection block as shown The terminal connection block is at the rear right hand side of the boiler and is accessed after removing the boiler front panel The supply cable should be safely routed...

Страница 12: ...ing from t oned upside d the switches t hree phase su elected output ED HEAT OU ial to confirm f electronic card 1 mum heat outp NS WHERE TH L MUST BE RE also be limited best hot wate mum but will s p...

Страница 13: ...remains in the system or there is insufficient pressure or flow rate the boiler will fail to operate and display fault E3 A LED indicator informs about the operating status of the pump Green correct...

Страница 14: ...SWITC GE COULD O gene on th Turn of th Main switc i temperatu nd other essages Red dot shows heating heating lements on duty 3 ghly prior to BS7593 BS54 boiler Any cle efully followed RESSURE REL T O...

Страница 15: ...ay o DHW produ W and the elem desired tempe rature can be t the setting t s or instantly between 20 a ver the centra m temperatur D n 1 The same but he butto y will show th uction over ce ments are en...

Страница 16: ...n fo er will be lock will function n e same button there is a fail ON l automatically activity The p 1 as room therm button Pushin ay will show th e of the water o adjust the v w seconds or C and 85 C...

Страница 17: ...3 Fault E3 continued System resistance too high or blockage Check pump speed 3 Check pump duty sect 4 9 Open all radiator valves Install system by pass Fault E5 displayed Error in configuration for ma...

Страница 18: ...ect the bo dition are he heating sys Check as sho m debris or a y restrictions s ostatic In th the boiler dur ever the guida g of an automa inimum flow r asteful circula OUTPUT actual heat po that mom...

Страница 19: ...most rigorous environmental requirements For example the selection of materials involves guaranteeing their biodegradability re use and recycling When this boiler s long useful life is over it must b...

Страница 20: ...3kW A 13 0 13 0 DHW available time with 15kW min 5 49 DHW available time with 13kW min 6 42 DHW available time with 12kW min 7 16 DHW available time with 11kW min 7 56 DHW available time with 10kW min...

Страница 21: ...arries the structions and 5 2 CLARACI De acuerdo DECLARAT According to LNUR S A LNUR S A I El Nogal V 8110 Algete Caldera modu Caldera modu CMBG Heat CMXBG Hea GABARR N CM15BG CM pecificacion ular al...

Страница 22: ...21 NOTES...

Страница 23: ...22 13 WIRING DIAGRAMS...

Страница 24: ...ufact ELNU Traves a de V 28110 Alge Telephone 3 ement the man dicates that this e collection po osed of corre ealth which co cycling of this p hased the prod plier UK Ltd 0 1942 67011 nur co uk nur co...

Отзывы: