POSITION OF LOOPERS THREADS TAKE UP LEVER
18
a
b
46.0mm
47.3m
m
1. Remove: Mains lead and Inside cover unit (
"7"
in page 2a).
2. Turn the handwheel towards you and bring upper looper thread take up lever
"a"
in its
highest position.
3. Check and make sure that the distance between thread take up lever guide and inside of the
machine base is at
46.0 to 47.3 mm
.
4. If not, loosen allen screw
"b"
and adjust position.
5.
Tighten screw
"b"
.
Содержание 745 -
Страница 1: ...745 845 SERVICE MANUAL 2 2 5 5 1 3 5 NA 6 0 B 1 2 1 T P T P...
Страница 12: ...1a REMOVING MACHINE BASE COVER 1 Remove Mains lead 2 Remove Machine base Unit 1 by loosening screws a a 1 a a...
Страница 18: ...a HEIGHT AND ALIGNMENT OF CLOTH PRESSER BAR 4a 5 b c 4 7mm...
Страница 24: ...TIMING OF LOWER LOOPER 8a A B C D b a 5 2mm R1 Fig 1 Fig 2 Fig 3...
Страница 35: ...MOVING CUTTER AND VERTICAL FEED TIMING 14a R1 A a B d c Fig 2 Fig 4 Fig 3 Fig 1 2mm 0 5 0 5mm 1 0 1 5mm...
Страница 51: ...ANNEX SETTING POSITIONS OF SL DF DIALS b c f d g e 2 1 C B A...
Страница 53: ...d ANNEX SETTING POSITIONS OF SL DF DIALS h i Z k j p SL Dial DF Dial Fig 3 Fig 4 i A n k a Fig 2 view Z view Z...
Страница 61: ...M E M O...