SpeedCut
15
Hoist Mount Box
Forklift Attachments
Clamp Head Assembly
Installation of Accessories (cont.)
Clamping System (optional) (cont.)
10. Finally with power connected to the electric hoist, use the
pendant switch to lower the hook until it touches the Eyebolt
at the top of the Clamp Head Assembly. Connect this hook
through the Eyebolt (Figure 8).
11. Ensure the hoist can safely raise the Clamp Head Assembly
without interference from the electrical cords or any other
installations.
12. Place the Anvil onto the table so that the 11/16” holes are
aligned with the inner set of slots on the table. Set the Anvil
so that it will support the tube sheet at the desired cut off
distance for the bundle cut (Figure 3). Using the 130GN
Hex Bolts, 132H Washers included in the box labeled “Anvil
Hardware”, secure the Anvil by bolting through the slots in the
Tube Sheet Support Table and into the Anvil Nuts. This position
can be adjusted at any time before or after a bundle cut.
13. Secure the Eyebolts in the outer set of slots on the Tube
Sheet Support Table with the 171K Nuts, and 549-27
Washers included in the box labeled “Tube Sheet Support
Table Hardware”. Attach Shackles to the Eyebolts. The Ratchet
Strap can be utilized by attaching it to the Shackles with
the J-hooks (Figure 4).
NOTE: All fasteners and bolts are SAE.
Figure 8
Figure 4
Figure 3
Lower Frame
Anvil
Содержание SpeedCut SCT78
Страница 2: ......
Страница 40: ...This page intentionally left blank...
Страница 41: ...This page intentionally left blank...