DOOR END ASSEMBLY
Components
1 Door end cill
2 Door end built in base/cills
1 Threshold ramp
5 Glazing bars of various lengths
2 Short horizontal braces
2 Medium horizontal braces
2 Diagonal bracing angles
2 Roof corner bars (marked “R”)
2 Side corner bars (unmarked)
1 Door track support
1 Top door track
From the main bag of fittings you will require the nuts and bolts. You will also require glazing
beading, 2 eave plates and 1 ridge plate. These are packed with the casement stay and are separate
from the main bag of fittings, unless you have already split this pack for the rear end assembly
INSTRUCTIONS
Assemble the frame in exactly the same way as the rear end, up to and including stage 8 of the rear
end. The door end roof corner bars have 5 holes, not 6.
BUILT IN BASE ONLY
Now attach the built in base sections/cills to the corner bars, leaving a space for the door(s) in be-
tween.
Now engage the door end cill with the 2 built in base cills by
pushing the angle of the cill under the locator as shown in the dia-
gram. At this stage the cill will move freely left and right but will
remain located to the built in base cill.
Slide 2 bolts into the bottom of the 2nd and 4th glazing bar and 3
bolts (only 1 if greenhouse to be sited on soft ground) into the free
end of each built in base section. Attach the bottom bolt in the 2nd and 4th glazing
bar to the hole in the door end cill, but do not put a nut on yet.
Note: the 2nd and
4th door end glazing bars are longer and do not sit on top of the base (as the
rear end glazing bars do), they go down the side of the built in base and at-
tach to the bottom cill. (Key point).
Attach the rectangular plate (with 3 slotted holes) to the 2 bolts inserted in the
glazing bars and the last bolt inserted into the base ensuring that the glazing bar is
tight down into the angle of the door end cill. Attach the diagonal angle brace to the top bolt of the
rectangular plate, and then to the bottom bolt of the eaves gusset plate. The 2 unoccupied bolts in
the base sections will be used to anchor the greenhouse to the floor.
Slide 3 bolts down the 1
st
and 5
th
glazing bar from the top, and 4 bolts down the 2
nd
and 4
th
glazing
bar. Secure the last one in each bar to the roof corner bars by inserting the bolt through the punched
hole in the flange.
Содержание 8'5" Wide Thyme
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 20: ...DOOR FRAME ASSEMBLY...
Страница 22: ...ROOF VENT ASSEMBLY...
Страница 32: ...THYME 8 GLAZING PLAN BUILT IN BASE...
Страница 34: ...THYME 8 GLAZING PLAN DWARF WALL...
Страница 38: ...PARTITION...
Страница 40: ...1603...