8
8. Put nuts on bottom bolts and lightly tighten.
9. Do the same with the other side frame assembly.
10. Make sure that the glazing bars reach both the built in base cill and the eaves in each case.
Tighten all nuts.
11. If you intend to fit any Elite accessories (louvers, shelf, staging) they will be packed with ½
head bolts to enable them to be retro fitted. You do not need to pre insert any bolts for these acces-
sories.
12. If you are fitting your greenhouse onto hard standing (flags, concrete etc.), then insert bolts into
the bolt channel of the built in base (generally 1 every 2’). These will be used to anchor the green-
house to the floor during general assembly.
If your greenhouse is over 12’5” in length, you will need to attach the side base sections together to
form the length of your greenhouse. You will notice that you have 4 side base pieces, 2 of which
will be un-fabricated at 1 end. These 2 sections are handed sections and must be fitted to the correct
side assembly.
The un-fabricated end of the base will be joined to the unhanded base section as shown below. It is
essential that the un-fabricated end is towards the middle of the greenhouse side assembly and not at
one of the ends.
To attach the 2 base pieces together you must attach 2 corner bracket/base legs back to back, bolt
them together and attach the vacant end of each corner bracket/base leg to the bolt channel of the
base section as shown. Your gutter section will be in one piece and will not need to be joined
(except where greenhouse is over 20’5”).
Содержание 7'5'' VANTAGE
Страница 1: ......
Страница 2: ...2 ...
Страница 3: ...3 ...
Страница 9: ...9 SIDE FRAME ASSEMBLY WELL DONE YOU HAVE SUCCESSFULLY COMPLETED THE 2 SIDE FRAMES ...
Страница 11: ...11 REAR END ASSEMBLY ...
Страница 16: ...16 DOUBLE DOOR ASSEMBLY ...
Страница 20: ...20 DOOR FRAME ASSEMBLY ...
Страница 34: ...34 OPTIONAL EXTRA RAINWATER KITS ...
Страница 36: ...36 1806 ...