E nglish
13.2Belt conveyor
The belt conveyor is installed at the rear of the machine and transports the shredded material
upwards. The length of the belt conveyor is 2.5m. The height of the belt conveyor can be adjusted from
1.65m to 1.90m. It is driven by a hydraulic
m otor that is independently acti
vated. Care must be taken
to ensure that the belt conveyor is switched on when you start feeding material.
Attaching the belt conveyor
Cauti
on :
Prior to fitting the belt conveyor to the machine, always be sure to switch off
the engine.
• Remove the safety guard cover (M8, SW13)
Warn
ing :
The cover is part of the safety guard and prevents you from coming into contact
with the blades. Removing this cover results in an inferior degree of protection.
Be
extremely careful and never insert your hands underneath the safety guard.
• Refit
the spring,
flat
washer and bolt into their
locations place, so as not to loose them.
• Using 2 persons, hold the belt conveyor at both sides.
Cauti
on :
The belt conveyor weighs approximately 45 kg; do not underestimate this
weight.
Prevent back injuri
es by bending your knees when lifting
the weight.
Содержание Superprof 2000
Страница 1: ...M A NU AL Superprof...
Страница 2: ...lish...
Страница 14: ...E nglis BQ 505 010160 BQ 505 112116 BQ 505 010130 BQ 505010 070...
Страница 22: ...gi ven by theenginemake...
Страница 24: ...thewar r ant y card...
Страница 26: ...pr ope rt y...
Страница 28: ...debrist o pr ot ectitf orm ov erh eating...
Страница 30: ...si t uationwher e you no longerhave cont rolov erthework...
Страница 36: ...rearfla p...
Страница 39: ...28...
Страница 46: ...engine and remov e theignit i onkey...
Страница 48: ...r emov e theexc es s oil...
Страница 51: ...anglegrinderwitha grindingdi sc sui t ablef ors t eel...
Страница 53: ...no purp os e Thi s i s th e time t o rev ers e or r enew th e blad es...
Страница 55: ...gr oup...
Страница 75: ...info el i e t eu www el i e t e u...