DOC
NUMBER
595R495
68
SERVICE MANUAL Blast Chiller Freezer 100 - 200
The digital test of the mechanical
components has been done. Press
the button to access next step ( cy-
cle testing)
Heating Unit Test:
The hot cycle phase testing, it is necessary to check
the
proper cycle operation; Press the button and the cycle start.
In the dashboard “Status” is indi-
cated the first Step
“Preparing
phase”
The “
Preparation phase
” will end
only when the temperature set in
the “
Cavity set”
is reached.
The screenshot below shows the
actual temperature of the cavity
Содержание SKCH 100
Страница 1: ...SERVICE MANUAL FREEZER 100 150 200 2019 Doc N 595R49500 Edition 0 1 00 09 2019 ...
Страница 138: ...DOC NUMBER 595R495 138 SERVICE MANUAL Blast Chiller Freezer 100 200 6 4 33 LED lamps Steps for replacing the LED lamps ...
Страница 140: ...DOC NUMBER 595R495 140 SERVICE MANUAL Blast Chiller Freezer 100 200 ...
Страница 141: ...DOC NUMBER 595R495 141 SERVICE MANUAL Blast Chiller Freezer 100 200 ATTENTION ...
Страница 148: ......