Doc
#
E145701
4-10
4: Electrical Installation
Electro
Industries/GaugeTech
™
Powered by Innovation™
1a. Example of Dual Phase Hookup
Select: “ 3 EL WYE ” (3 Element Wye) from the Shark® meter’s Front Panel Display.
(See Chapter 6.)
lc
HI
LO
lb
HI
LO
la
HI
LO
Earth Ground
x
L(+)
Power
Supply
Connection
N(-)
L(+)
GND
N(-)
Vref
Va
Vb
Vc
LINE
LOAD
CT
Shorting
Block
FUSES
2 x 0.1A
FUSE
3A
C
C
B
B
A
A
N
N
Содержание Shark 100B
Страница 1: ...V 1 34 February 4 2021 ...
Страница 2: ...This page intentionally left blank ...
Страница 4: ...Doc E145701 ii Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 214: ...Doc E145701 E 6 E Using the USB to IrDA Adapter CAB6490 Electro Industries GaugeTech Powered by Innovation ...