6: Using the Shark® 100 Meter
Electro
Industries/GaugeTech
™
Powered by Innovation™
The example test procedure that follows covers the testing of the Shark® meter. The
test procedure used for the Standard shall be determined by the manufacturer of the
Standard used.
Test Procedure
1. All circuits and equipment must be de-energized.
2. Connect the three phase potential input lines to "Va", "Vb", and "Vc" and the neu-
tral to "V-Ref" & "GND."
3. Connect power leads to the "L" and "N" connections.
4. Monitor the #1 test pulse by placing the photo detector over the #1 LED.
5. Connect the three phase current inputs to the current terminals associated with the
test pulse LED being monitored. There must be no other current inputs connected.
6. Energize the Standard and the Shark® meter. To assure accuracy, both must be on
for a minimum of 30 minutes.
7. Energize the sources and wait for the outputs to stabilize before starting the test.
8. Start the test as per the appropriate procedure for the Standard and/or comparator
used.
9. When the test is completed, de-energize the sources.
10. Place the photo detector over the next test pulse to be monitored.
11. Repeat steps 5 through 10 until all test pulses are checked.
12. De-energize all circuits and remove power from the Standard, sources, and the
Shark® meter.
13. Disconnect all connections from the Shark® meter.
Содержание Shark 100B
Страница 1: ...V 1 34 February 4 2021 ...
Страница 2: ...This page intentionally left blank ...
Страница 4: ...Doc E145701 ii Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 214: ...Doc E145701 E 6 E Using the USB to IrDA Adapter CAB6490 Electro Industries GaugeTech Powered by Innovation ...