![Electro Industries/GaugeTech Shark 100B Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/electro-industries-gaugetech/shark-100b/shark-100b_installation-and-operation-manual_2379723065.webp)
Doc
#
E145701
4-5
4: Electrical Installation
Electro
Industries/GaugeTech
™
Powered by Innovation™
Communication connections are detailed in Chapter 5.
NOTE:
Figures 4.1 - 4.4 show the back of a meter with the 485P option. If your meter
is a Shark® 100B or is a Shark® 100 with the INP10 option, you will see an RJ45 port
and KYZ Pulse Output on the back of the meter. If your meter is a Shark® 50B, you
will see both an RS485 and RJ45 port, but no KYZ Pulse Output.
4.3: CT Leads Pass Through (No Meter Termination)
The second method allows the CT wires to pass through the CT inputs without termi-
nating at the meter. In this case, remove the current gills and place the CT wire
directly through the CT opening. The opening accommodates up to 0.177” / 4.5mm
maximum diameter CT wire.
Figure 4.2: Pass Through Wire Electrical Connection
Current
gills
removed
CT wire
passing
through meter
Содержание Shark 100B
Страница 1: ...V 1 34 February 4 2021 ...
Страница 2: ...This page intentionally left blank ...
Страница 4: ...Doc E145701 ii Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 214: ...Doc E145701 E 6 E Using the USB to IrDA Adapter CAB6490 Electro Industries GaugeTech Powered by Innovation ...