![Electro Industries/GaugeTech Shark 100B Скачать руководство пользователя страница 127](http://html.mh-extra.com/html/electro-industries-gaugetech/shark-100b/shark-100b_installation-and-operation-manual_2379723127.webp)
Doc
#
E145701
6-31
6: Using the Shark® 100 Meter
Electro
Industries/GaugeTech
™
Powered by Innovation™
Limits (Shark® 100 Meter V-Switch V4, Only)
Limits are transition points used to divide acceptable and unacceptable measure-
ments. When a value goes above or below the limit, an out-of-limit condition occurs.
Once they are configured, you can view the out-of-Limits (or Alarm) conditions in the
Limits Log or Limits Polling screen. You can also use Limits to trigger relays. See the
CommunicatorPQA®, MeterManagerPQA®, and EnergyPQA.com
TM
Software User
Manual
for details.
For up to 8 Limits, set:
Address: Modbus Address (1 based)
Label: Your designation for the limit
High Set Point: % of Full Scale
Example
: 100% of 120VFS = 120V; 90% of 120V FS = 108V
Return Hysteresis: Point to go back in Limit
Содержание Shark 100B
Страница 1: ...V 1 34 February 4 2021 ...
Страница 2: ...This page intentionally left blank ...
Страница 4: ...Doc E145701 ii Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 214: ...Doc E145701 E 6 E Using the USB to IrDA Adapter CAB6490 Electro Industries GaugeTech Powered by Innovation ...