![Electro Industries/GaugeTech Nexus 1262 Скачать руководство пользователя страница 248](http://html.mh-extra.com/html/electro-industries-gaugetech/nexus-1262/nexus-1262_user-manual_2379732248.webp)
Doc# E151701 11-22
11: Switchboard Meter
Electro
Industries/GaugeTech
™
Powered by Innovation™
11.6: E137370 Retrofit Panel - S1 to M1 Case Retrofit
The E137370 M1 retrofit panel will convert any S1 (GE) relay case meter (or relay) to
fit in the dimensions of a large case M1 format. Using this conversion panel, a user
can mount a Nexus® 1262/1272 S1 form switchboard meter to fill the cutout of an
existing M1 case.
The E137370 can be ordered as an accessory option.
To use the panel:
1. Attach the switchboard meter to the retrofit panel, using the built-in switchboard
screws (see Figure 11.7).
2. Place the switchboard meter with retrofit panel into the space for the M1 case and
attach the retrofit panel using screws in all four corner holes.
Figure 11.21: Attaching the Panel and Inserting the Meter
1262/1272 Switchboard Meter
Retrofit Panel
Panel with M1 Cutout
Содержание Nexus 1262
Страница 1: ......
Страница 2: ...This page intentionally left blank ...
Страница 4: ...Doc E151701 ii Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 86: ... RF 2SHUDWLQJ QVWUXFWLRQV 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Страница 97: ...This page intentionally left blank ...
Страница 98: ......
Страница 272: ...Doc E151701 A 2 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 273: ...Doc E151701 A 3 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 274: ...Doc E151701 A 4 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 275: ...Doc E151701 A 5 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...