Doc# E151701 11-6
11: Switchboard Meter
Electro
Industries/GaugeTech
™
Powered by Innovation™
11.4: Installation
The Switchboard meter provides easy installation and removal from installation.
IMPORTANT!
Before installing the meter, check the battery connections (see
Sections 6.2 and 5.4.4).
1. Insert the case into a prepared mounting hole. Secure with mounting screws.
2. Slide the meter into the case and secure it by sliding the chassis levers until they
snap into place. Connectors for the following are located on the back of the meter.
The connectors automatically plug into the available connectors on the mounting
board (see Figure 11.8).
• Pulse Outputs - Four Channels
• Status Inputs
• Phone
• Line/Network
• Power In
• COM4, COM1
• IRIG-B
• Modem Gateway RS485
3. Position the Switchboard case front against the four screw holes and secure it by
turning the four built-in screws in each of the corners. See Figure 11.7.
Содержание Nexus 1262
Страница 1: ......
Страница 2: ...This page intentionally left blank ...
Страница 4: ...Doc E151701 ii Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 86: ... RF 2SHUDWLQJ QVWUXFWLRQV 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Страница 97: ...This page intentionally left blank ...
Страница 98: ......
Страница 272: ...Doc E151701 A 2 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 273: ...Doc E151701 A 3 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 274: ...Doc E151701 A 4 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 275: ...Doc E151701 A 5 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...