Doc# E151701 6-21
6: Hardware Installation
Electro
Industries/GaugeTech
™
Powered by Innovation™
6.3: Internal Battery Installation and Maintenance
CAUTION! - BATTERY INSTALLATION OR REPLACEMENT MUST BE DONE
WITH POWER OFF!
ATTENTION! - L'INSTALLATION OU LE REMPLACEMENT DE LA PILE DOIT
ÊTRE FAIT SANS ALIMENTATION!
Depending on its age, the Nexus® 1262/1272 meter could be equipped with either of
two types of batteries:
• Older meters are equipped with 3 V Lithium cell BR2032.
• Meters shipped after February, 2010 are equipped with 3 V Lithium cell
Panasonic BR3032.
Examine the specific meter and be sure to install the correct battery.
Figure 6.20: Meter without Internal Shroud
The Internal battery maintains NVRAM and time during outages. It is located on one
of the vertical panels inside the Internal Shroud (see Figure 6.5). Under normal
conditions, the battery should provide in excess of 10 years of service during storage
conditions (disconnected from terminals) or when properly installed in an energized
meter. The battery should provide more than one year of service during outage
Содержание Nexus 1262
Страница 1: ......
Страница 2: ...This page intentionally left blank ...
Страница 4: ...Doc E151701 ii Electro Industries GaugeTech Powered by Innovation This page intentionally left blank ...
Страница 86: ... RF 2SHUDWLQJ QVWUXFWLRQV 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Страница 97: ...This page intentionally left blank ...
Страница 98: ......
Страница 272: ...Doc E151701 A 2 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 273: ...Doc E151701 A 3 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 274: ...Doc E151701 A 4 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...
Страница 275: ...Doc E151701 A 5 A TLC Spreadsheet and Examples Electro Industries GaugeTech Powered by Innovation ...