![Ekofires eko 2030 Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/ekofires/eko-2030/eko-2030_instruction-manual_2374143007.webp)
VENTILATION
No purpose provided ventilation is normally required for this appliance. The requirements of other appli-
ances operating in the same room or space must be taken into consideration when assessing ventilation.
If spillage is detected when commissioning the appliance then amongst other problems there may be insuf-
ficient natural ventilation for the correct operation of the flue. This is potentially a greater problem should
the property be of modern nature. If the appliance does not spill with windows open but does with windows
closed, this proves that lack of ventilation is the problem, if not, it will be the flue at fault. Installation of an
air brick is the best solution. Any ventilation fitted must comply with BS 5871 part 2 and BS 5440 part 2.
Spillage detected during commissioning is almost always a result of poor flue performance, which cannot be
corrected by any amount of ventilation.
For Republic of Ireland ventilation may be required, see IS 813, ICP3, IS 327, and any other rules in force.
PREFABRICATED FLUE BOXES
This appliance can be fitted into a number of proprietory flue boxes, provided that the minimum dimensions
given in the diagram below are complied with. The flue outlet of the fire
must not
obscure the flue outlet
from the flue box. A smooth path into the flue must exist.
Constructional Note:
The frame of the fire, any back panel or other infill panel, and the flue box must be
sealed together so that there is no possibility of leakage between them. Adequate clearances to combustible
materials (e.g. false chimney breast construction) must be maintained.
The manufacturers’ instructions for the fitting of the prefabricated flue box shall be complied with at
all times.
Some flue boxes may require minor adaption when fitting the fire using the cable fixing kit.
The firebox, base of the flue box, and the hearth may be drilled to allow plugs and screws to secure instal-
lation.
It is important that the sealing requirements of the appliance are met at all times and that the flue box is
well sealed to any back or infill panel.
Note: The DEPTH dimensions shown are inclusive of any back or infill panels.
4
5.0
175mm min internal
dia twin wall flue tube
210mm Min depth
400 mm min
opening width
540mm min
opening height
6.0
©
2009 Focal Point Fires plc.
Содержание eko 2030
Страница 2: ...Eko 2030...