GOOD 10 C- GOOD 12 C
Use and maintenance manual
Page 57
Rev.0 01/03/2019
EN
Stove start-up
Before starting-up the stove complete the following procedure:
1. Insert the power supply cable.
2. Position the switch located on the back of the stove to position 1.
3. Verify that the system is connected to the chimney.
4. Load the tank with 6 mm pellet
6. Load the auger as described in the reference chapter
7. Press the P1-2 key for 3 seconds.
At this point the stove will complete the start-up phase. The following wording will appear on the display (the wording may vary depending on the model):
• ACCENDE (Start-up)
• ATTESA FIAMMA (Awaiting flame)
• FIAMMA PRESENTE (Flame present)
• LAVORO (Operation)
During the work phase one must verify the following settings:
• IMPOSTAZIONE SET DI POTENZA (Power set settings)
• IMPOSTAZIONE SET TEMPERATURA AMBIENTE (Room temperature setting)
• IMPOSTAZIONE MISCELA PELLET/ARIA (Pellet/Air mix setting
Operational warnings
•
Shut-off the stove in case of malfunction or improper functioning using the 3 key.
• Do not place pellet manually into the brazier.
• The accumulation of unburnt pellet in the brazier after multiple start-up failures must be removed before proceeding with
a new ignition - Do NOT pour unburnt pellet into the tank after a start-up failure.
• Do not place fuels different from wood pellet into the tank.
• Do not start-up the stove using flammable materials in case of start-up system malfunction.
PHASE
DESCRIPTION
FINAL CLEANING
The stove is in shut-off phase and the cooling phase has not yet been completed
START-UP
The spark plug pre-heat phase has started, and the pellet starts to fall in the brazier
Awaiting flame
The pellet ignites thanks to the heat of the entering air which passes through the conduit of the incan
-
descent resistance
Flame present
Flame is visible in the brazier
OPERATION
The stove has terminated the ignition phase: it is not possible to change work power
Modulate work
The set room temperature set has been reached.
ECO STOP
Comfort Clima activated, set room temperature reached. The stove is off
T ON
The room probe is interrupted or an external thermostat has been connected
Fan awaiting start
The stove is in cooling phase: once this condition has been reached it will start automatically
Fan wait restart
The stove is in cooling phase: once this condition has been reached it will re-start automatically
Start-up awaiting re-start
The hot re-start phase has been started. Operation is the same as the ACCENDE (Start) phase
Smoke
The maximum threshold has been reached: to cool down the stove pellet load and draught is is
reduced at PT01
OFF
The stove is off
Synthetic phase diagram
! IMPORTANT
IF THE "HOT FUMI (SMOKE)" SIGNAL IS DISPLAYED, IT MEANS THERE ARE COMBUSTION
PROBLEMS. IT IS THEREFORE NECESSARY TO CONTACT THE AREA Technical After-Sales
Service C.A.T. FOR AN INSPECTION
Optional Remote Control
IR remote control to remotely operate the thermo-stove
4
3
5
6
1
2
• 1 - 2 Temperature adjustment
:
allows setting the room temperature value desired, from
a maximum of 40°C to a minimum of 6°C.
•
5 - 6 Power adjustment
:
allows setting the work power value from a minimum
value of 1 to a maximum value of 5.
• 3 ON/OFF:
if pressed for two seconds, the stove can be manually
switched on and off
.
• 4 With no function
Содержание Good 10 C
Страница 2: ......
Страница 19: ...Manuale uso e manutenzione GOOD 10 C GOOD 12 C Pag 19 Rev 0 01 03 2019 ITA MONTAGGIO CERAMICHE 1 2 3 x2 ...
Страница 20: ...Manuale uso e manutenzione GOOD 10 C GOOD 12 C Pag 20 Rev 0 01 03 2019 ITA 4 x4 5 ...
Страница 49: ...GOOD 10 C GOOD 12 C Use and maintenance manual Page 49 Rev 0 01 03 2019 EN 4 x4 5 ...
Страница 77: ...Manuel d utilisation et d entretien GOOD 10 C GOOD 12 C Page 77 Rev 0 01 03 2019 FR 4 x4 5 ...
Страница 104: ...Manual de uso y mantenimiento GOOD 10 C GOOD 12 C Pág 104 Rev 0 01 03 2019 ES MONTAJE DE LAS CERÁMICAS 1 2 3 x2 ...
Страница 105: ...Manual de uso y mantenimiento GOOD 10 C GOOD 12 C Pág 105 Rev 0 01 03 2019 ES 4 x4 5 ...
Страница 132: ...Manual de uso e manutenção GOOD 10 C GOOD 12 C Pag 132 Rev 0 01 03 2019 PT MONTAGEM DAS CERÂMICAS 1 2 3 x2 ...
Страница 133: ...Manual de uso e manutenção GOOD 10 C GOOD 12 C Pag 133 Rev 0 01 03 2019 PT 4 x4 5 ...
Страница 152: ...DATE WORK PERFORMED MAINTENANCE ...
Страница 153: ...DATE WORK PERFORMED MAINTENANCE ...
Страница 154: ......
Страница 155: ......