FUNCTIONING CONCEPT
Below, the 11 stages of system functioning are listed.
FIRST START-UP
ATTENTION:
fi
rst start-up should be carried out by an authorised EDILKAMIN Technical Support
Centre (TSC) which will check:
• all the standards already mentioned and the standards in force in the installation location were
applied;
• correct installation of the boiler and the chimney
fl
ue;
• that there is no danger for the boiler and the installation environment.
IMPORTANT:
The manufacturer cannot be held liable for poor functioning of the boiler or any damage caused by
it to people or property if:
•
fi
rst start-up was not carried out in compliance with the above;
• boiler installation was not carried out perfectly in compliance with standards;
• installation of the system was carried out without complying with the standards in force.
The manufacturer declines any disputes or complaints if the standards for good functioning of the
boiler are not complied with.
INSTRUCTIONS FOR USE
1
OFF
2
CHECK UP
3
SWITCH ON
4
STABILISATION
5
SWITCH ON RECOVERY
6
NORMAL
7
MODULATION
8
STAND BY
9
SAFETY
10
SWITCH OFF
11
BLOCK
Содержание LAGUNA M 25
Страница 37: ...37 ITALIANO POSIZIONE DISPOSITIVI SICUREZZA Posizione termostato sicurezza a riarmo manuale ISTRUZIONI D USO...
Страница 82: ...82 ENGLISH SAFETY DEVICES POSITIONING Position of manual reset safety thermostat INSTRUCTIONS FOR USE...
Страница 127: ...127 FRAN AIS POSITIONNEMENT DES DISPOSITIFS DE S CURIT Position thermostat s curit au r armement manuel MODE D EMPLOI...
Страница 272: ...272 cod 941249 02 16 E w w w e d i l k a m i n c o m...