- 64
-
ENGLISH
DIRECT CONNECTION
The circulator on the boiler activates if the temperature is over 50°C.
SYSTEM FILLING
Having carried out all the plumbing connections for the boiler, you need to proceed with system
fi
lling. To correctly
fi
ll the system, proceed as follows:
• open any shut-off valves;
• open the radiator vents so the air exits without forming bubbles;
• loosen the automatic vent valve plug under the front, upper surface;
(jolly valve see
fi
gure below)
• open the loading valve and start the system very slowly;
• close the radiator vents as soon as the water exits;
• loading pressure must be over 1.5 bar;
• close the loading valve;
• release the air via the radiator vents;
• switch on the boiler for the
fi
rst time bringing the system to temperature;
• stop the boiler and repeat the operations to bleed the air.
INSTALLATION
S1 = SAFETY
VALVE
DISCHARGE
VALVE
ANTI-CONDENSATE 55°C
Содержание LAGUNA M 25
Страница 37: ...37 ITALIANO POSIZIONE DISPOSITIVI SICUREZZA Posizione termostato sicurezza a riarmo manuale ISTRUZIONI D USO...
Страница 82: ...82 ENGLISH SAFETY DEVICES POSITIONING Position of manual reset safety thermostat INSTRUCTIONS FOR USE...
Страница 127: ...127 FRAN AIS POSITIONNEMENT DES DISPOSITIFS DE S CURIT Position thermostat s curit au r armement manuel MODE D EMPLOI...
Страница 272: ...272 cod 941249 02 16 E w w w e d i l k a m i n c o m...