15
Scout 320 REV 3:2018
4. Installation
4.1 Lathe Preparation
Prior to installing the bar feeder, the lathe installation must be completed and ready to produce
parts. If no lathe spindle work holding is installed or no compressed air the bar feeder cannot be
installed.
Caution should be taken, only qualified electrician or serviceman should
perform any electrical troubleshooting or maintenance to this equipment.
Warning be sure lathe and bar feeder emergency stop is engaged
when performing the manual alingment procedure.
Lathe must be operational to perform the alingment and installation with the proper
chucking package.
Refer to the Typical Installation Guide following this section