6
NOTICE
Used to address practices not related to personal
injury.
2.3
Installation shall conform to requirements of
authority having jurisdiction or in absence of such
requirements:
•
United States
•
National Fuel Gas Code, ANSI Z223.1/NFPA 54.
•
National Electrical Code, NFPA 70.
•
Canada
•
Natural Gas and Propane Installation Code,
CAN/CSA B149.1.
•
Canadian Electrical Code, Part I, Safety Standard
for Electrical Installations, CSA C22.1
2.4
Where required by authority having jurisdiction,
installation shall conform to Standard for Controls
and Safety Devices for Automatically Fired Boilers,
ANSI/ASME CSD-1�
Additional manual reset low water cutoff may be required.
2.5
Requirements for Commonwealth of
Massachusetts:
Boiler installation must conform to Commonwealth of
Massachusetts code 248 CMR which includes but is not
limited to:
• Installation by licensed plumber or gas fitter.
CAUTION
Indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury.
!
WARNING
Indicates a hazardous situation which, if not avoided,
could result in death or serious injury.
!
DANGER
Indicates a hazardous situation which, if not avoided,
WILL result in death or serious injury
!
This is the safety alert symbol. Symbol alerts you to
potential personal injury hazards. Obey all safety messages
following this symbol to avoid possible injury or death.
2.2
Become familiar with symbols identifying
potential hazards�
2.1
General
Boiler installation shall be completed by qualified agency.
See glossary for additional information.
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Improper installation could result in death
or serious injury. Read this manual and understand
all requirements before beginning installation.
!
2 - IMPORTANT SAFETY INFORMATION
Содержание 075 97gb
Страница 44: ...44 13 TROUBLE SHOOTING ...
Страница 48: ...48 13 TROUBLE SHOOTING ...
Страница 50: ...50 13 TROUBLE SHOOTING ...
Страница 61: ...61 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Страница 62: ...62 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Страница 78: ...78 NOTES ...
Страница 79: ...79 Company Address Phone Company Name Tech Initials Service Performed Date ...