11
TABLE 2: BOILER CLEARANCES
Dimension
Combustible
Materials
(1)
Service
(1)(2)
Top (A)
0" (0 cm)
14" (36 cm)
Left Side (B)
6" (16 cm)
6" (16 cm)
Right Side (C)
0" (0 cm)
1½" (4 cm)
Front (D)
0" (0 cm)
6" (16 cm)
Back (E)
0" (0 cm)
0" (0 cm)
Bottom (F)
0" (0 cm)
0" (0 cm) Floor
12" (32 cm) for
Bottom Piped
Combustion
Air/Vent piping
0" (0 cm)
6" (16 cm)
Hot Water
Piping
See local code
6" (16 cm)
(1)
Required distances measured from boiler.
(2)
Service, proper operation clearance recommendation.
4 - LOCATING BOILER
F L O O R
F L O O R
A
E
E
D
B
FIGURE 4-1 Clearance to Combustible Materials
4.1
Boiler Location Considerations
•
Ambient room temperature always above 32°F (0°C) to
prevent freezing of liquid condensate.
•
Approved for installation in closets and on combustible
floors. Do not install boiler on carpeting.
•
Protection of gas ignition system components from
water (dripping, spraying, rain, etc.) during operation
and service (circulator replacement, condensate trap,
control replacement, etc.).
•
Floor or wall mounting.
•
Wall must be plumb and capable of supporting boiler
weight plus 60 lbs (28 kg). See Table 1.
•
Floor must be level. Leveling feet allow adjustment
up to 1/4" (6 mm).
•
Wall mounting. See section 4.3.
•
Access to outdoors to meet minimum and maximum
pipe lengths for combustion air and vent piping. See
section 6.
•
Disposal of condensate. See section 6.
•
Drainage of water (or water - antifreeze solution) during
boiler service or from safety relief valve discharge. See
section 5.
•
Access to system water piping, gas supply, and electrical
service. See sections 5, 7 and 8.
•
Clearances to combustible materials and service
clearances. See Table 2 and figure 4-1.
•
Multiple Boilers can be placed side by side, back to back
or wall mounted.
B
A
A
C
C
Содержание 075 97gb
Страница 44: ...44 13 TROUBLE SHOOTING ...
Страница 48: ...48 13 TROUBLE SHOOTING ...
Страница 50: ...50 13 TROUBLE SHOOTING ...
Страница 61: ...61 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Страница 62: ...62 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Страница 78: ...78 NOTES ...
Страница 79: ...79 Company Address Phone Company Name Tech Initials Service Performed Date ...