35
9.4
Boiler Start-up and Operational Test
1.
Verify air is purged from hydronic piping
2.
System test pumps - verify each pump is
operational
3.
Verify gas piping
• Confirm pressure test. See section 7.4.
•
Visually inspect piping to determine there are no
open fittings or ends, and all valves at unused
outlets are closed and plugged/capped.
•
Purge air from piping
•
Check piping and connections for leaks
immediately after gas is turned on. Shut off
gas supply and make necessary repairs if leaks
found.
4.
Follow OPERATING INSTRUCTIONS to initiate boiler
operation. See section 10.
5.
Inspect combustion air and vent piping. Verify pipe
is not leaking and terminations are unobstructed
and vent gas discharge is not a nuisance or hazard.
6.
Verify boiler functions.
7.
Inspect condensate disposal system. Verify
condensate flows adequately and is disposed
properly.
8.
Check control module operation.
9.
Check field sourced limits, low water cutoffs, etc.
per manufacturer's instructions.
9 - START UP PROCEDURE
9�5 Check Combustion
Natural Gas
1.
Measure input. English units*
•
Turn off gas to all other appliances.
•
Activate some heating zones to dissipate heat.
• Set boiler on high fire.
•
Use ½, 1 or 2 cu ft dial on gas meter. Measure
time required for one or more complete
revolutions. Measure time for 1-2 minutes.
•
Calculate input.
Input (MBH)
=
3600 x cu ft
seconds
Example: Gas flow from
Meter = 2 cu ft
Measured time = 72 seconds
Rate (MBH)
=
3600 x 2 cu ft
=
100 MBH
72 seconds
*Metric - See Glossary
2.
Compare measured input to table. Adjust input rate
if needed using Table 12 below.
Table 12 - Rate @ High Fire
Size
Minimum
Maximum
075
65
85
100
90
102
Natural Gas and Propane
3.
Measure CO
2
at high fire and compare to table.
Adjust CO
2
if needed using figure 9-3 . See figure
9-5 combustion air analyzer port.
Natural Gas only**
4.
Measure input. Compare to table above. Continue
to measure input and CO
2
until both measured
values are within range specified in tables
.
Содержание 075 97gb
Страница 44: ...44 13 TROUBLE SHOOTING ...
Страница 48: ...48 13 TROUBLE SHOOTING ...
Страница 50: ...50 13 TROUBLE SHOOTING ...
Страница 61: ...61 14 WIRING DIAGRAM 14 1 Connection Diagram ...
Страница 62: ...62 14 WIRING DIAGRAM 14 2 Schematic Diagram of Ladder Form ...
Страница 78: ...78 NOTES ...
Страница 79: ...79 Company Address Phone Company Name Tech Initials Service Performed Date ...