background image

14

SOlAR pIpING

Hot Water Recirculation

Hot Water Recirculation for Solar Hot Water Storage Tanks
Hot water recirculation is for the continuous circulation of hot water for 

instant hot water at the hot water faucets. Solar tank tappings provide 

hot water recirculation return at the distance mid-height at the side of 

the tank. See Figure 8. Location of tapping will not allow for mixing of 

back-up heated hot water (boiler indirect of electric element) into lower 

solar heated section of the tank.
When an anti-scald device is installed it is critical to feed cold supply of 

mixing valve with return of recirculated hot water. This is important to 

keep hot water recirculation loop operating through the mixing valve 

even if tank temperatures are above mixing valve setting.  Other wise 

the mixing valve will not allow flow of hot water though it and disable 

recirculation loop of hot water.

Hot Water Can Scald!

Water heated to temperature for 

clothes washing, dish washing and 

other sanitizing needs can scald and 

cause permanent injury.

Children, elderly, and infirm or 

physically handicapped persons are 

more likely to be permanently injured 

by hot water. Never leave them 

unattended in bathtub or shower. Never 

allow small children to use a hot water 

tap or draw their own bath.
•  If anyone using hot water in the 

building fits the above description, 

or if state laws or local codes 

require certain water temperatures 

at hot water taps, you must take 

special precautions:

•  Use lowest possible temperature 

setting.

•  Install some type of 

tempering device, such as an 

automatic mixing valve, at 

hot water tap or water heater. 

Automatic mixing valve must 

be selected and installed 

according to manufacturer's 

recommendations and 

instructions.

Water passing out of drain valves may 

be extremely hot. To avoid injury:
•  Make sure all connections are tight.
•  Direct water flow away from any 

person.

Pipe Relief Valve 

Discharge to within 

6" of floor, see 

Section III Notes.

FIGURE 8

Содержание H2O60DE

Страница 1: ...I80DE H2 OI115D H2 OI115E H2 OI115DE An ISO 9001 2008 Certified Company ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ecrinternational com Information and specifications outlined...

Страница 2: ...is operating Do not touch any components unless they are cool Failure to follow all instructions in the proper order can cause personal injury or death Read all instructions including all those contai...

Страница 3: ...defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product Indicates a presence o...

Страница 4: ...180 H2O080E 80 8 0 56 0 28 0 1 NPT 150 145 H2O60E 60 8 3 62 3 23 5 1 NPT 150 135 Dual Coil No Electric Backup H2O115D 115 7 4 8 9 74 0 28 0 1 NPT 150 205 H2O80D 80 7 4 8 0 56 0 28 0 1 NPT 150 175 H2O...

Страница 5: ...w Pressure Drop gal hr gal hr Through Coil Through Coil Top Coil Bottom Coil gal min Ft Water 115 Gal Units 190 214 10 0 3 9 80 Gal Units 180 214 10 0 3 6 60 Gal Units 185 214 10 0 3 5 Note All Rating...

Страница 6: ...l based on the expected water usage for the given site The average residence with one shower or more will require a Model 40 or larger The Model 30 should only be considered for residences with minima...

Страница 7: ...e The water heater is controlled with an additional zone valve Select a valve with a low pressure drop and assure minimum flow with adequate pipe sizing B Priority or Non Priority for Hot Water 1 Opti...

Страница 8: ...e boiler system during service 2 Unions Allows for easy locating or removal 3 Vacuum breaker Protects the water heater from collapse if a hot tank is valved off to service other components in the syst...

Страница 9: ...the domestic water system 2 Position the water heater in the final location 3 Connect the cold water supply piping Install piping onto cold inlet connection Connect to cold water supply connection usi...

Страница 10: ...hat uses Zone Valves refer to Figure 3 The water heater connection labeled BOILER SUPPLY should be piped to the boiler supply piping after the air purger and before the space heating circulator Mount...

Страница 11: ...11 Figure 2 Typical Mixing Valve Install Figure 1 Domestic Water Piping Pipe Relief Valve Discharge to within 6 of floor see Section III Notes...

Страница 12: ...Discharge to within 6 of floor see Section III Notes Pipe Relief Valve Discharge to within 6 of floor see Section III Notes Figure 3 Boiler water piping with zone circulators Figure 4 Boiler water pip...

Страница 13: ...13 Pipe Relief Valve Discharge to within 6 of floor see Section III Notes Figure 5 Figure 6 Figure 7 Pipe Relief Valve Discharge to within 6 of floor see Section III Notes...

Страница 14: ...of hot water Hot Water Can Scald Water heated to temperature for clothes washing dish washing and other sanitizing needs can scald and cause permanent injury Children elderly and infirm or physically...

Страница 15: ...temperature in the water heater If it is set too high the resulting hot water can cause painful scalding with possible serious and permanent injury The temperature at which this occurs varies with a p...

Страница 16: ...ing our ARM 4P Panel Product features include Build in transformer that will support up to 15 zones Transformer has electronic fuse protection 1 to prevent transformer overloading Data Port Terminal f...

Страница 17: ...17 BOILER T T BOILER T T BOILER T T...

Страница 18: ...All wiring shall be done in accordance with all applicable local and state codes Adjusting Thermostat Temperature Dial Minimum potable water temperature can be changed by adjusting thermostat Before a...

Страница 19: ...roblem Symptoms are identical to sediment buildup If repeated flushing does not resolve the problem chemical cleaning may be required Contact a qualified contractor VII Troubleshooting PROBLEM CAUSE S...

Страница 20: ...0 1st HOUR CONTINUOUS GAL HR GAL HR GAL HR GAL HR GAL HR GAL HR RATING RATING Boiler flow 14 gpm Boiler flow 14 gpm RATING RATING RATING RATING 1st HOUR CONTINUOUS 1st HOUR CONTINUOUS 1st HOUR CONTINU...

Страница 21: ...21...

Страница 22: ...nth 13th year from the original date of installation seventy five percent 75 Within the fourteenth 14th year through the fifteenth 15th year from the original date of installation eighty percent 80 Pl...

Страница 23: ...ble all other terms and provisions hereof shall nevertheless remain effective and shall be enforced to the fullest extent permitted by law The warranties made under this Limited Warranty are exclusive...

Страница 24: ...ECR International Inc 2201 Dwyer Avenue Utica NY 13504 4729 web site www ecrinternational com H2 O...

Отзывы: