4
Dimensions ................................................ 2
.................................. 3
Table of Contents ........................................ 4
Important
...................................... 7
............................................ 8
Fresh Air for Combustion ............................12
Chimney and Vent Pipe Connection
Vent Damper Operation ..............................15
......................................16
........................................17
................................18
Operating Your Boiler .................................19
..............................20
Start-up Cleaning ......................................22
.................................23
............................................24
Wiring Diagrams ........................................25
............................27
Appendix A - Vent Damper ........................... 28
Appendix A - Vent Damper TroubleShooting . 29
Repair Parts ................................................. 31
.................................... 35
TABLE OF CONTENTS
KEEP THIS MANUAL NEAR BOILER
RETAIN FOR FUTURE REFERENCE
GAS FIRED STEAM BOILERS
Check our website frequently for updates: www.ecrinternational.com
Information and specifications outlined in this manual in effect at the
time of printing of this manual. Manufacturer reserves the right to
discontinue, change specifications or system design at any time without
notice and without incurring any obligation, whatsoever.
Introduction
Boiler is designed for use in closed heating systems where
all steam is returned as condensate and make-up water is
minimal. Boiler is not designed for or intended for use in
open systems using 100% make-up water.
Prior to Installation
•
Verify correct boiler for type of gas being used
natural or propane. See Rating Plate.
•
Verify boiler size and dimensions. See Figure 1 page 2.
•
Verify ratings and capacity data for natural gas. See
Table 1 page 3.
Installation Requirements
•
Supply boiler with correct gas (natural or propane),
fresh air for combustion, and suitable electrical supply.
•
Connect boiler to adequate venting and piping
systems.
•
Provide boiler with properly located and adjusted
thermostat.
Installation of boiler in building under construction, use
precaution to insure clean combustion air supply during
construction process. Airborne particulate from construction
materials can clog burner ports and cause incomplete
combustion and sooting.
Complete all steps for safe and proper heating system
operation.
PN 14683003 Rev. O [10/01/2021]