GAS SUPPLY PIPING

General

• 

Use piping materials and joining methods acceptable 

to authority having jurisdiction.  In absence of such 

requirements National Fuel gas Code, ANSI Z223.1/

NFPA 54.

• 

Size and install gas piping system to provide sufficient 

gas supply to meet maximum input at not less than 

minimum supply pressure. 

See Tables 4a and 4b.

Table - 4a        Gas Pipe Sizes - Natural Gas

Length 

of Pipe 

- Ft.

Pipe  Capacity  -  BTU  Per  Hour  Input            

Includes Fittings

1/2"

3/4"

1"

1 -1/4"

20

92,000

190,000 350,000 625,000

40

63,000

130,000 245,000 445,000

60

50,000

105,000 195,000 365,000

Table - 4b        Gas Pipe Sizes - Propane Gas

Length 

of Pipe 

- Ft.

Pipe  Capacity  -  BTU  Per  Hour  Input            

Includes Fittings

5/8"

3/4"

1/2"

3/4"

20

131,000 216,000 189,000 393,000

40

90,000

145,000 129,000 267,000

60

72,000

121,000 103,000 217,000

* Outside diameter

Length of pipe or tubing should be measured from the gas meter 

or propane second stage regulator.

• 

Support piping with hooks straps, bands, brackets, 

hangers, or building structure components to prevent or 

dampen excessive vibrations and prevent strain on gas 

connection.  Gas valve will not support piping weight.

• 

Use thread (joint) compound (pipe dope) suitable for 

natural and liquefied petroleum gas.

• 

Install field sourced manual main shutoff valve, ground 

joint union, and sediment trap upstream of gas valve. 

See Figure 10.

Leak Check Gas Piping

Pressure test boiler and gas connection before placing 

boiler in operation. Avoid excessive pressure that could 

damage pressure regulators, valves, or meters.

• 

Pressure test at 1/2 psig (3.5 kPa) or less.  Isolate 

boiler from gas supply system by closing manual gas 

shutoff valve. 

• 

Locate leakage using gas detector, noncorrosive 

detection fluid, or other leak detection method 

acceptable to authority having jurisdiction.  Do not 

use matches, candles, open flames, or other methods 

providing ignition source.

• 

Correct leaks immediately and retest.

Figure 10   - Gas Piping At Boiler

Propane Installation

• 

Connections by licensed propane dealer only.

• 

Use two stage regulator provided by propane 

supplier.

• 

Have propane supplier check piping.

 WARNING

Fire, explosion, asphyxiation hazard. Verify boiler 

is equipped with propane gas orifices and gas valve 

is configured for propane. Failure to follow these 

instructions may result in serious injury or death.

!

   

CAUTION

WHAT TO DO IF YOU SMELL GAS

• 

Do not try to light any appliance.

• 

Do not touch any electrical switch; do not use 

any phone in your building.

• 

Immediately call your gas supplier from a 

neighbor’s phone.  Follow gas supplier’s 

instructions. 

• 

If you cannot reach your gas supplier, call the fire 

department.

!

!

  

DANGER

Fire Hazard.  Do not use matches, candles, open 

flames, or other methods providing ignition source. 

Failure to comply will result in death or serious 

injury.

!

  

 PN 14683003 Rev. O [10/01/2021]

Содержание Dunkirk PLYMOUTH STEAM 2 Series

Страница 1: ...DEL PSB Electronic Intermittent Ignition MODELS PSB 3D PSB 3DP PSB 4D PSB 4DP PSB 5D PSB 5DP PSB 6D PSB 6DP PSB 7D PSB 7DP PSB 8D PSB 8DP PSB 9D PSB 9DP Manufactured by ECR International Inc 2201 Dwye...

Страница 2: ...1 6 2 4 7 PSB 7D 7 24 7 4 5 7 PSB 8D 7 27 8 6 6 7 PSB 9D 7 30 9 5 7 7 Add 5 to height for Vent Damper 1 Add model number suffix P for Propane Gas 3 section only Figure 1 Dimensions LEFT SIDE FRONT RIG...

Страница 3: ...er Fuel Type Input MBTUH Heating Capacity MBTUH AFUE Net AHRI Rating Mbh Net AHRI Rating Sq Ft 1 PSB 3D 3 Natural Gas 75 62 82 7 47 195 Propane 70 58 82 7 44 183 PSB 4D 4 Natural Gas 112 91 82 0 68 28...

Страница 4: ...em design at any time without notice and without incurring any obligation whatsoever Introduction Boiler is designed for use in closed heating systems where all steam is returned as condensate and mak...

Страница 5: ...Failure to follow these instructions could result in minor or moderate injury WARNING Fire explosion asphyxiation and electrical shock hazard Improper installation could result in death or serious inj...

Страница 6: ...dish washing and other sanitizing needs can scald and cause permanent injury Children elderly and infirm or physically handicapped persons are more likely to be permanently injured by hot water Never...

Страница 7: ...enting and maintenance of ambient temperature at safe limits under normal conditions of use Boiler location should not interfere with proper circulation of air Introduce outside air if normal infiltra...

Страница 8: ...valve and discharge line Install safety valve with spindle in vertical position WARNING Burn and scald hazard Safety relief valve could discharge steam or hot water during operation Install discharge...

Страница 9: ...ser s and header shall be 2 pipe size 10 Equalizer line shall be minimum 1 pipe size 11 The near boiler piping shall include a 2 tee with a plug located on the supply line as shown for skimming i e su...

Страница 10: ...10 Figure 3 Recommended Near Boiler Piping Using One Supply Tapping 3 4 Section Sizes SYSTEM PIPING PN 14683003 Rev O 10 01 2021...

Страница 11: ...LVES A B OPEN FOR HEATING CLOSE FOR COOLING VALVES C D CLOSE FOR HEATING OPEN FOR COOLING Figure 4 Recommended Near Boiler Piping Using Two Supply Tappings 5 thru 9 Sections Figure 5 Chilled Water Pip...

Страница 12: ...lume shall be greater than 21 cubic feet divided by ACH air changes per hour x Total Input Mbh C Refer to National Fuel Gas Code for opening requirements between connected indoor spaces All Outdoor Ai...

Страница 13: ...wever not longer than 3 4 the chimney height HT Figure 6 page 14 Vent Pipe Fasten sections of vent pipe with 3 sheet metal screws at each joint to make piping rigid Support horizontal portions of vent...

Страница 14: ...appliance to their previous conditions of use 7 Any improper operation of the common venting system should be corrected so the installation conforms with the National Fuel Gas Code ANSI Z223 1 NFPA 54...

Страница 15: ...ing guide refer to manual Appendix A of this manual and literature packaged with vent damper Horizontal Installation To Boiler Vent Damper To Chimney NO NO YES YES Flow Install vent damper with actuat...

Страница 16: ...0 Leak Check Gas Piping Pressure test boiler and gas connection before placing boiler in operation Avoid excessive pressure that could damage pressure regulators valves or meters Pressure test at 1 2...

Страница 17: ...molex harness that plugs into 4 pin molex receptacle inside vent damper control Vent damper must be connected for boiler to operate Thermostat Installation 1 Install thermostat on inside wall per manu...

Страница 18: ...y and turn clockwise to OFF Do not force For Your Safety Read Before Operating WARNING If you do not follow these instructions exactly a fire or explosion may result causing property damage personal i...

Страница 19: ...of boiler Determine water level when boiler is off and cold when all water in the system is inside the boiler and return piping below water line and everything above water line is air no steam When b...

Страница 20: ...softer blue outer mantel with no yellow Remain still when observing main burner flames Check main burner orifices burner throat and flame ports for dust and lint obstruction if flame appearance is no...

Страница 21: ...n thermostat to call for heat C Gas valve opens for approximately 10 seconds time delay on probe type LWCO gas valve will close and red indicator illuminates on LWCO D When water is restored it waits...

Страница 22: ...w boiler to cool Add fresh water slowly up to normal water line Start burners Maintain at least 180 F for 15 minutes to remove dissolved gasses from fresh water Shut off burners 8 Allow system to oper...

Страница 23: ...eassemble all parts 10 Check tightness of pilot connections and condition of burner flames after reassembly See Figures 14 and 15 Boiler Water Treatment Other Than Cleaners In steam systems where syst...

Страница 24: ...ut switch blown Have your service technician check heat exchanger for blockage Chimney flue is blocked Spill switch contacts open requiring manual reset of spill switch Have your service technician ch...

Страница 25: ...Water Cut Off Shown CG400 PSE802 CG400 N 2 H 1 C P1 W A B P2 Terminals PSE802 To CG400 Cross Reference If any of the original wire as supplied with this appliance must be replaced it must be replaced...

Страница 26: ...nal wire as supplied with this appliance must be replaced it must be replaced with type 105 C Thermoplastic wire or its equivalent Figure 17 Wiring Diagrams For Boilers With 67D 1 Float Type Low Water...

Страница 27: ...4 water feeder maybe used with either of the low water cutoffs listed Water feeder maintains safe minimum water level Keeps boiler running by compensating for minor evaporative steam leaks and prevent...

Страница 28: ...in Molex plug see Below This will create bypass of the damper boiler should then ignite IF NOT source problem is not the damper Go to Aquastat end of wiring harness Brown Yellow Orange Black V Slot Co...

Страница 29: ...anticipator 3 Loose or broken connections 4 Off On operating limit or low water cut off 5 Off On blocked vent switch or flame roll out 1 Turn thermostat up to call for heat 2 Replace thermostat 3 Tig...

Страница 30: ...n 2 Restore to damper pipe to round verify not binding 3 Correct the condition Damper Rotates Continuously 1 Defective damper motor assembly 1 Replace damper motor assembly Note For troubleshooting on...

Страница 31: ...00814AC 42500815AC 42500816AC 42500817AC 42500818AC 42500819AC 13 Jacket Front Panel 42500811AC 42500804AC 42500805AC 42500806AC 42500807AC 42500808AC 42500809AC 14 Tie Rod Nut 14605001 14605002 14605...

Страница 32: ...6 3 10 32 3 16 Hex Hd Screw 14695301 4 Gas Manifold 14616033 14616034 14616035 14616013 14616014 14616015 14616016 5 Main Burner Orifice 14615031 14615031 14615031 14615035 14615035 14615035 14615035...

Страница 33: ...740 2 Pilot Tube 14615005 14615006 3 10 32 3 16 Hex Hd Screw 14695301 4 Gas Manifold 14616010 14616011 14616012 14616013 14616014 14616015 14616016 5 Main Burner Orifice 14615036 6 Main Burner Regular...

Страница 34: ...0522 9B Probe only for Hydrolevel Cycle Guard 240010925 10 Intermittent Pilot Control 14662070 11 NPT x 4 Nipple PF 033 02 12 x x Brass Tee PS 802 only 14693051 13 Brass Coupling PS 802 only 14693052...