42
9-10 Control Module J7 Connector
J7 Connector
9.7 Complete Start Up Procedure
1.
Reset control parameters to operating settings if
adjusted to allow startup and operation test.
2.
Follow instructions TO TURN OFF GAS TO APPLIANCE
(page 43) if boiler is not being placed into
immediate operation.
3.
Enter installer information on Warranty Registration
Card.
4.
Gather all instructions, manuals, wiring diagrams,
warranty registration card and other supporting
information. Review with user and/or affix in
conspicuous location adjacent to boiler.
9 - START UP PROCEDURE
P/N# 240008888, Rev. O [07/15/2015]
Содержание Dunkirk Helix DKVLT-050
Страница 48: ...48 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Страница 52: ...52 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Страница 54: ...54 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Страница 66: ...66 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM P N 240008888 Rev O 07 15 2015...
Страница 67: ...67 14 WIRING DIAGRAM 14 3 Connection Diagram 150 200 299 MBH P N 240008888 Rev O 07 15 2015...