background image

21

6.1 General

This boiler requires a dedicated direct vent system. 

Install combustion air and vent piping in accordance 

with these instructions, authority having jurisdiction, 

and:  

• USA - National Fuel Gas Code, ANSI 223.1/NFPA 54.
• Canada - Natural Gas and Propane Installation Code, 

CAN/CSA B149.1

Vent connections serving appliances vented by natural draft 

shall not be connected into any portion of mechanical draft 

systems operating under positive pressure.
Install vent system in accordance with these instructions.

6.2 Removal of Existing Boiler From Common 

Vent System

When existing boiler is removed from common venting 

system, common venting system is likely to be too large for 

proper venting of appliances remaining connected to it. 
After removal of existing boiler, following steps shall 

be  followed with each appliance remaining connected to 

common venting system placed in operation, while other 

appliances remaining connected to common venting system 

are not in operation:

• Seal any unused openings in common venting system.
• Visually inspect venting system for proper size and      

horizontal pitch. Determine there is no blockage or 

restrictions, leakage, corrosion and other deficiencies 

which could cause an unsafe condition.

• When practical, close all building doors, windows, and 

all doors between space in which appliances remaining 

connected to common venting system are located 

and other spaces of building. Turn on clothes dryer 

and any appliance not connected to common venting 

system. Turn on exhaust fans, such as range hoods and 

bathroom exhaust so they will operate at maximum 

speed. Do not operate summer exhaust fan. Close 

fireplace dampers.

• Turn on appliance being inspected. Follow lighting         

instructions. Adjust thermostat so appliances will operate 

continuously.

• Test for spillage at draft hood relief opening after 5    

minutes of main burner operation.  Use flame of match or 

candle, smoke from cigarette, cigar or pipe.

• Determine each appliance remaining connected to  

common venting system properly vents when tested 

as outlined above. Then return doors, windows,              

exhaust fans and any other gas-burning appliance to 

their previous condition of use.

• Any improper operation of common venting system 

should be corrected so installation conforms with National 

Fuel Code, ANSI Z223.1/NFPA 54 and/or Natural Gas 

and Propane Installation Code, CAN/CSA B149.1. 

When re-sizing any portion of common venting system, 

common venting system should be re-sized to approach  

minimum size as determined using appropriate tables in 

Chapter 13 of the National Fuel Gas Code, ANSI Z223.1/

NFPA 54 and/or Natural Gas and Propane Installation 

Code, CAN/CSA B149.1.

6.3 Venting Materials 

• See Table 4

Table 4 - Combustion air and vent pipe fittings 

must conform with the following:

Item

Material 

Standards

Vent Pipe 

and Fittings

PVC schedule 40

ANSI/ASTM D1785

PVC - DWV

ANSI/ASTM D2665

CPVC schedule 40

ANSI/ASTM D1784/

F441

SDR-21 & SDR-26 PVC

ANSI/ASTM D2241

ABS-DWV

ANSI/ASTM D2661

Schedule 40ABS

ANSI/ASTM F628

PP (Polypropylene)

Pipe and  Components

UL 1738

ULC S636-08

Pipe 

Cement/

Primer

PVC 

ANSI/ASTM D2564

CPVC

ANSI/ASTM F493

Schedule 40 ABS

ANSI/ASTM D2235

• IPEX is approved vent manufacturer in Canada listed 

to  ULC-S636.

• IPEX System 636 Cements and Primers are approved 

in Canada listed to ULC-S636.

Use of cellular core PVC (ASTM F891), cellular core CPVC, or Radel

® 

,

(Polyphenolsulfone) in venting systems shall be prohibited.

WARNING

Use of cellular core PVC for venting flue gas could 

result in death, or serious injury.

!

  

6 - COMBUSTION AIR AND VENT PIPING

WARNING

Covering non-metallic vent pipe and fittings with 

thermal insulation shall be prohibited.

 P/N# 240008888, Rev. O [07/15/2015]

Содержание Dunkirk Helix DKVLT-050

Страница 1: ...NTENANCE MANUAL P N 240008888 Rev O 07 15 2015 Models DKVLT 050 DKVLT 075 DKVLT 100 DKVLT 150 DKVLT 200 DKVLT 299 Manufactured by ECR International Inc 2201 Dwyer Avenue Utica NY 13501 web site www ec...

Страница 2: ...back of boiler Plastic Plug 2 ea 18 Used for packaging holes on back of boiler Outdoor Sensor 19 Used for measuring outside temperature Critical Installation Instruction 20 11 x 17 Page for critical...

Страница 3: ...41mm Depth C 14 356mm 16 0 406mm 18 3 465mm Bracket D 28 711mm 40 1016mm Height E 31 787mm 42 1092mm Water Connections Size F 1 1 4 NPT 1 1 4 NPT Location G 2 51mm 2 51mm Location H 5 127mm 2 51mm Loc...

Страница 4: ...Terminal Requirements 28 6 8 Multiple Boiler Venting Installation 30 6 9 Condensate Piping 31 7 Gas Supply Piping 32 8 Electrical Connections 34 8 3 Line Voltage Connections 34 8 4 External Connection...

Страница 5: ...pressure Exceed 195 F 90 5 C system design temperature 1 3 Operational Features Modulating 20 100 Integral Dual Limit Integral Low Water Cutoff with test button Outdoor Temperature Reset Integral Mult...

Страница 6: ...N Indicates a hazardous situation which if not avoided could result in minor or moderate injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury DAN...

Страница 7: ...lve Fuel supply isolation during servicing See section 7 19 Combustion Air Blower Delivers proper quantity of combustion air receives fuel from gas valve mixes air and fuel sending mixture to burner f...

Страница 8: ...3 3 Upper and Lower Jacket Latch Viewed from front of boiler Lift Jacket up engage jacket with chassis push down FIGURE 3 2 Lower Jacket Viewed from front of boiler Disconnect connector before removin...

Страница 9: ...TING SYSTEM IN 14 SUPPLY WATER TO HEATING SYSTEM OUT 4 LOW VOLTAGE TERMINAL STRIP 15 VENT TEMPERATURE SENSOR 26 GAS CONNECTION 33 COMBUSTION ANALYSIS TEST PORT 24 HIGH VOLTAGE JUNCTION BOX 9 HEAT EXCH...

Страница 10: ...NSATE COLLECTOR 3 RETURN WATER FROM HEATING SYSTEM IN 14 SUPPLY WATER TO HEATING SYSTEM OUT 4 LOW VOLTAGE TERMINAL STRIP 33 COMBUSTION ANALYSIS TEST PORT 26 GAS CONNECTION 24 HIGH VOLTAGE JUNCTION BOX...

Страница 11: ...C to prevent freezing of liquid condensate Approved for installation in closets Protect gas ignition system components from water dripping spraying rain etc during operation and service circulator rep...

Страница 12: ...boiler vertically or slightly tilted backward to insure proper function of low water cutoff Failure to follow these instructions could result in death or serious injury When mounting boiler onto wall...

Страница 13: ...irculation Install flow control valves or other automatic means to prevent gravity circulation of boiler water during cooling cycle 5 3 Safety Relief Valve and Air Vent NOTICE Boiler rated at 150 psig...

Страница 14: ...dance Additional considerations Boiler control is designed for single central heating pump Installer responsible for integration of multiple central heating pumps Boiler control allows domestic hot wa...

Страница 15: ...drain Table 3 System Piping Configurations Single Boiler Two Pipe Zoned System With Zone Valves figure 5 5 With Zone Pumps figure 5 6 Primary Secondary Pumping Closed External Primary Loop figure 5 7A...

Страница 16: ...ystem With Zone Pumps Heat exchanger ball valve open as shipped Heat exchanger ball valve open as shipped DHW Pump CH System Pump DHW Pump Zone Pump 5 HYDRONIC PIPING 3 8 10mm Open End Wrench may be r...

Страница 17: ...ternal primary loop ball valves closed FIGURE 5 7B Single Boiler Using Primary Secondary Pumping With Open External Primary Loop CH System Pump 12 305mm Maximum separation Existing closely spaced tees...

Страница 18: ...88 Rev O 07 15 2015 Up to 16 boilers DHW Pump See Multiple Boiler Guide CH System Pump 12 305mm Maximum Separation System Temperature Sensor Size common piping per maximum heat capacity of entire syst...

Страница 19: ...Load Heating Load Existing closely spaced tees in primary system loop 12 305mm Maximum Separation Up to 16 boilers CH System Pump 12 305mm Maximum Separation System Temperature Sensor Size common pipi...

Страница 20: ...305mm Maximum Separation CH System Pump 12 305mm Maximum Separation System Temperature Sensor Size common piping per maximum heat capacity of entire system Heat exchanger ball valve open as shipped L...

Страница 21: ...at so appliances will operate continuously Test for spillage at draft hood relief opening after 5 minutes of main burner operation Use flame of match or candle smoke from cigarette cigar or pipe Deter...

Страница 22: ...installations only All venting material primer and glue must be listed to ULC S636 Canadian installations only First 3 ft 0 9 m of plastic vent pipe from vent connector must be readily accessible for...

Страница 23: ...Air Roof Single Pipe Figure 6 10 Side Wall Two Pipe Figures 6 2 6 3 Concentric Figures 6 4 6 5 6 6 Inside Air Single Pipe Figure 6 11 Table 7A Combustion Air Venting Locations Type Location Terminal...

Страница 24: ...of different appliances 15 381mm Max horizontal length of vent Min vent intake between different appliances 12 305mm Max allowable total vertical vent length with outside exposure is 10 ft 3 05m Aband...

Страница 25: ...ment of termination kit in side wall Vent Combustion Air 1 25 4mm Maximum See Note 2 or 3 51 or 76mm Diameter PVC intake combustion air Combustion Air 2 51mm Diameter 41 Length 1 1m 3 76mm Diameter 47...

Страница 26: ...8 Flue on Roof Air Intake on Side Wall FIGURE 6 9 Flue on Roof Combustion Air Grade Snow Ice Terminate vent system bottom minimum 12 300 mm above highest anticipated snow level Avoid locations where...

Страница 27: ...inal for vent as shown in Fig 6 14 does not have a max separation requirement between flue gas and fresh air FIGURE 6 14 Side Wall Venting Terminal w T Terminal Combustion Air Vent w Accelerator 1 25...

Страница 28: ...s or gravity inlet If boiler uses inside air min 4 1219 mm 12 305mm Min Termination Forced Air Inlet 3 0 9m If located within 10 3m of forced air inlet Termination Less than 10 3m Min 3 0 9m Min FIGUR...

Страница 29: ...ecirculated vent gases Give consideration to excessive wind and locate away from windward side of building Vapors Position termination where vent vapors are not objectionable Walkways Locate vent term...

Страница 30: ...ultiple boiler application boiler can vent individually or use common vent pipes If boilers vent individually follow guidelines as described in figures 6 1 through 6 7 If boilers vent through common v...

Страница 31: ...pipe minimum 1 4 per foot 21mm m away from boiler Use field source condensate pump if boiler located below disposal point Field source condensate neutralizing kit as required by authority having juri...

Страница 32: ...manual main shutoff valve outside of jacket See figure 7 2 7 2 Conversion Kit Instructions See Gas Conversion Kit Instructions included with Boiler Table 10 Gas Supply Pressure CAUTION WHAT TO DO IF...

Страница 33: ...ector noncorrosive detection fluid or other leak detection method acceptable to authority having jurisdiction Do not use matches candles open flames or other methods that can provide ignition source C...

Страница 34: ...oltage terminal strip CH PUMP L N G Domestic Hot Water Pump if used A Isolate pump from control module if pump FLA exceeds maximum allowable current draw See Figure 8 3 and Table 11 B Connect pump to...

Страница 35: ...to DHW T T terminals Wires are interchangeable Central Heating Thermostat A Use thermostat or boiler system control with dry contacts related 0 5 amps 120 VAC Boiler control does not provide 24 VAC p...

Страница 36: ...s if available Close manual gas shut off valve Let system run for 30 minutes When boiler goes into lockout reset boiler by pressing Reset button until boiler resets Do not open gas shutoff valve until...

Страница 37: ...5 F 40 91 C Temperature Units F F C Installer Menu Boiler Configuration Boiler Address 0 0 15 Low Water Cutoff Enabled Enable Disabled Pump Mode 0 0 4 Service Reminder Status On ON OFF Service Reminde...

Страница 38: ...vate some heating zones to dissipate heat Set boiler on high fire Use 1 or 2 cu ft dial on gas meter Measure time required for two or more complete revolutions Measure time for one or more minutes Cal...

Страница 39: ...ower starts flashing Scroll down to Low Power Push Enter Low Power stops flashing and becomes solid Boiler is now locked in LOW fire Adjust Offset Screw slowly and in small steps no more than 1 8 of a...

Страница 40: ...nd adjustment of Offset Screw 2 Set boiler to High Power using System Test to confirm combustion in High Fire Step 2 3 Combustion setting is now complete A Exit System Test mode by pushing Enter High...

Страница 41: ...system 4 Establish call for heat Jump CHW T T terminals on low voltage terminal block Turn on boiler using boiler service switch 5 Boiler will fire Based on natural convection within boiler boiler wi...

Страница 42: ...ctions TO TURN OFF GAS TO APPLIANCE page 43 if boiler is not being placed into immediate operation 3 Enter installer information on Warranty Registration Card 4 Gather all instructions manuals wiring...

Страница 43: ...h automatically lights the burner Do not try to light burner by hand Remove upper jacket panel Turn gas shutoff valve clockwise to closed position Handle should be perpendicular to gas pipe Wait 5 min...

Страница 44: ...turi air inlet for blockage and clean as required verify pressure test port cap and combustion test port are in place return temperature sensor clip must be securely seated on pipe Check boiler for an...

Страница 45: ...ve and or gasket material from removed burner Clean burner using air hose directed into top of burner opening to dislodge any debris in burner ports Inspect burner for foreign matter in flame ports or...

Страница 46: ...socket See figures 11 3 11 4 Remove condensate collector assembly from heat exchanger and flue pipe Flush collector and condensate trap with water Follow Burner Inspection Kit instructions to reassemb...

Страница 47: ...stallations above 4500 feet 1350 m above sea level TABLE 12 1 SEA LEVEL RATINGS NATURAL AND PROPANE GASES Size Boiler Input Rate MBH 1 Heating Capacity MBH 1 2 Net AHRI Rating Water MBH 1 3 AFUE 2 Max...

Страница 48: ...48 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...

Страница 49: ...High Temperature opens during normal operation Go to Page 54 Control Module detects flame after gas valve is closed more than 10 seconds Replace Gas Valve Flame is detected before gas valve opens Rep...

Страница 50: ...e 59 Boiler power supply ground wire is not grounded Go to Page 60 Control board internal error Power down then power up boiler If error repeatedly occurs replace control module Replace Control Module...

Страница 51: ...Gas Valve and J13 connector on Control Module NO YES Disconnect J13 connector on Control Module Measure resistance across third blue wire and fourth brown wire terminals Is resistance between 1 0 and...

Страница 52: ...52 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...

Страница 53: ...ystem piping Flush system if water is dirty Is boiler supply pipe above heat exchanger hot Wait for boiler to cool down YES NO Replace Broken Switch Unplug molex connector on supply temperature sensor...

Страница 54: ...54 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...

Страница 55: ...J13 Continuity from J13 5 to Switch 1 Continuity from J13 6 to Switch 3 continuity of the two purple wires Disconnect harness from High Temperature Supply Switch and Control Module J13 Check continuit...

Страница 56: ...APPLIANCE Replace Gas Valve Turn off manual gas shutoff valve Follow instructions TO TURN OFF GAS TO APPLIANCE Replace Gas Valve Follow Operating Instructions to initiate boiler operation Enter Insta...

Страница 57: ...Repair System Piping remove any remaining air in system Connect harness to Transformer Disconnect harness from Low Water Cutoff Is 24 vac at terminals 1 2 Between blue and yellow wires YES NO P N 2400...

Страница 58: ...ging all air out of the system Replace Flue Gas Sensor Replace Control Module Use thermal couple to measure flue gas temperature through sampling port Is the measured temperature and flue temperature...

Страница 59: ...solution NO Is Heat Exchanger Pump properly oriented Pump arrow pointing down YES NO Disconnect harness from Return Water Sensor Measure resistance using digital ohm meter Is resistance between 950 t...

Страница 60: ...60 Hz 2 Replace Control Module YES YES NO NO Replace circuit breaker 13 TROUBLE SHOOTING Fix the connection These error messages are displayed when the control board detects fault in blower motor sys...

Страница 61: ...130 to 150 2K to 1K ohms 2K to 3K ohms 3K to 9K ohms 54 to 66 32 to 54 66 to 94 Supply Water Sensor Resistance Chart Disconnect field wiring Is continuity between field wiring neutral and ground less...

Страница 62: ...rature Sensor resistance with digital meter Estimate Sensor temperature Do temperature and resistance fall within ranges shown in chart Replace Wires 50 to 90 10 to 32 9K to 24K ohms 150 to 200 90 to...

Страница 63: ...Water Temperature Sensor Resistance Chart Disconnect wire harness from High Temperature Supply Switch Measure resistance across terminals 2 and 4 Does temperature fall within ranges shown in chart P...

Страница 64: ...Control Module Disconnect wire harness from Vent Temperature Sensor Measure Sensor resistance Does resistance match estimated flue temperature NO YES _ P _ _ _ Blocking Error E 6 5 Flue Sens Shorted...

Страница 65: ...65 14 WIRING DIAGRAM 14 1 Connection Diagram 050 075 100 MBH EXTERNAL PUMP RELAY LIMIT OF 1 AMP PER PUMP SEE SECTION 8 P N 240008888 Rev O 07 15 2015...

Страница 66: ...66 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM P N 240008888 Rev O 07 15 2015...

Страница 67: ...67 14 WIRING DIAGRAM 14 3 Connection Diagram 150 200 299 MBH P N 240008888 Rev O 07 15 2015...

Страница 68: ...ATA PWM HALL GND DC N GROUND FLAME SENSOR IGNITION LWCO CH THERMOSTAT USER INTERFACE DISPLAY ARGUS LINK MULTI BOILER OPTIONAL ARGUS LINK POWER ON OFF SUPPLY SENSOR RETURN SENSOR DHW THERMOSTAT FLUE SE...

Страница 69: ...Rapid oxidation of fuel gases accompanied by production of heat or heat and light Complete combustion of fuel is possible only in presence of adequate supply of Oxygen COMBUSTIBLE MATERIAL Materials m...

Страница 70: ...s with all requirements of authority having jurisdiction SAFETY RELIEF VALVE Valve designed to relieve pressure in hot water supply system when pressure exceeds pressure capability of equipment SAFETY...

Страница 71: ...e Scroll down to next menu item Decrease value Boiler Status Indicator F Flame Detected P Central Heating System pump On B Combustion Air Blower On S Safety Relay Check G Gas Valve Open D DHW Pump On...

Страница 72: ...s illustrated Control Module compares supply temperature to set point Boiler proceeds to ignition if supply temperature is less than set point Combustion Air Blower speed modulates to pre purge settin...

Страница 73: ...to heating demand When Boiler detects demand met will enter post purge mode then standby mode If simultaneous demand for Central Heat and DHW boiler will enter DHW Priority Mode Priority mode limits...

Страница 74: ...iple boiler installation submenu used to view runtime parameters See Multiple Boiler Manual This line is not shown if boiler is not in cascade system Boiler Status Supply Temperature set point display...

Страница 75: ...oint and cannot be changed Controller calculates set point based on outdoor temperature Note For explanation of available CH heating modes refer to CH Mode section located in CH Settings submenu in In...

Страница 76: ...ettings Modifies Domestic hot Water control settings such as DHW priority time Cascade Settings Refer to Multiple Boiler Manual System Test Tool aids setup of boiler installation or diagnosis of commo...

Страница 77: ...of safety period no flame detected control will go to post purge removing unburned gas Re ignition attempt started following same cycle Number of re ignition attempts limited to 3 after which lockout...

Страница 78: ...n Address Selection screen used to set boiler position in multiple boiler cascade installation Refer to Multiple Boiler Installation Manual Default setting of 0 indicates boiler is operating in single...

Страница 79: ...the CH System Pump electrical terminal block See page 56 for diagram The DHW pump terminal does not function This is typical of a hydronic system design which utilizes zone valves for all CH zones and...

Страница 80: ...Shutdown temperature Boiler will permanently attempt to satisfy CH demand when CH demand is available CH thermostat input is ignored CH set point calculated as function of outdoor temperature using o...

Страница 81: ...re follows thick black line in graph below based on outdoor temperature Note Modes only function when outdoor temperature sensor connected If Open outdoor sensor detected CH set point equal to Boiler...

Страница 82: ...ting 100 DHW Settings Two DHW modes are available DHW Mode 0 No DHW DHW Mode is disabled The DHW thermostat input is ignored and the DHW pump is not used DHW Mode 2 DHW Store with Thermostat Boiler re...

Страница 83: ...esent System Test has priority over any system demand while test mode activated System Test mode automatically ends after 30 minutes boiler resumes normal operation The following modes are available D...

Страница 84: ...is provided primarily to permit the use of an external energy management system that serves the same function THIS OVERRIDE MUST NOT BE USED UNLESS AT LEAST ONE OF THE FOLLOWING CONDITIONS IS TRUE An...

Отзывы: