39
9 - START UP PROCEDURE
2.
Perform combustion test on HIGH fire using calibrated
combustion analyzer. Adjust CO2 to within specifications
by rotating the Throttle Screw, counterclockwise
to
increase CO2 level, clockwise to decrease CO2 level.
See Figures 9-3, and 9-4.
After adjusting CO2 to correct level, verify:
(1) CO PPM level is in specified range and
(2) flame signal is in specified range. See Appendix A
page 76.
CO2 level, CO PPM level, and flame signal for HIGH fire
are given in the following tables.
HIGH Fire Combustion - 299 MBH
Gas
CO2
CO
Flame
signal
Min
Max
Design
Target
μA
Natural Gas
9.0%
9.3%
9.3%
<200ppm 6.5 – 7.5
Propane
10.0% 11.0
10.5%
HIGH Fire Combustion - 50/75/100/150/200 MBH
Gas
CO2
CO
Flame
signal
Min
Max
Design
Target
μA
Natural Gas
9.0%
9.5%
9.5%
<200ppm 6.5 – 7.5
Propane
10.0% 11.0 11.0%
3.
Switch to LOW fire in boiler System Test. On user
interface push Enter. “HIGH power” starts flashing.
Scroll down to “Low Power”. Push Enter. “Low Power"
stops flashing and becomes solid. Boiler is now locked
in LOW fire.
Adjust Offset Screw slowly and
in small steps, no more than 1/8
of a turn each time. See Figures 9-5 and 9-6.
Perform combustion test on LOW fire using
calibrated combustion analyzer. Adjust CO2 to within
specifications by turning Offset Screw, clockwise
to
increase CO2 level, counterclockwise
to decrease
CO2 level. After adjusting CO2 to correct level, verify
(1) CO PPM level is in specified range and
(2) flame signal is in specified range.
CO2 level, CO PPM level, and flame signal for LOW fire
see following tables.
FIGURE 9-3 Gas Valve - Models
050/075/100/150/200 MBH
FIGURE 9-4 Gas Valve - Model 299 MBH
Throttle Screw
Throttle Screw
WARNING
Fire, explosion, asphyxiation and electrical shock
hazard. Read this instruction and understand all
requirements, including requirements of authority
having jurisdiction before making adjustments. Failure
to follow these instructions could result in death or
serious injury.
!
P/N# 240008888, Rev. O [07/15/2015]
Содержание Dunkirk Helix DKVLT-050
Страница 48: ...48 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Страница 52: ...52 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Страница 54: ...54 13 TROUBLE SHOOTING P N 240008888 Rev O 07 15 2015...
Страница 66: ...66 14 2 Schematic Diagram of Ladder Form 050 075 100 MBH 14 WIRING DIAGRAM P N 240008888 Rev O 07 15 2015...
Страница 67: ...67 14 WIRING DIAGRAM 14 3 Connection Diagram 150 200 299 MBH P N 240008888 Rev O 07 15 2015...