![Ecolab Elados EMP KKS E60 Скачать руководство пользователя страница 238](http://html.mh-extra.com/html/ecolab/elados-emp-kks-e60/elados-emp-kks-e60_operating-instructions-manual_2354530238.webp)
10.4.3.1 Preparation
Fig. 80: Calibration pump with oval gear meter (OGM
PLUS
)
1.
Connect the pump ready for operation on the pressure side
Chapter 7 ‘Device installation’ on page 32
2.
Fill a suitable measuring cylinder and insert the suction line or suction and return
line.
NOTICE!
The volume of the measuring cylinder should be 1/50 of the metering pump
rate in litres/h. During this process, the suction line must not change its
position.
The calibration of the metering pump is only valid for the currently set stroke
length setting. After changing the stroke length, the calibration must be
performed again.
Menu description
102
417101442 Rev. 12-02.2019
Содержание Elados EMP KKS E60
Страница 2: ......
Страница 123: ...14 2 Abmessungen Abb 89 Abmessungen Technische Daten 121 417101442 Rev 12 02 2019 ...
Страница 134: ...16 Konformitätserklärung Abb 95 Konformitätserklärung Konformitätserklärung 132 417101442 Rev 12 02 2019 ...
Страница 135: ......
Страница 258: ...14 2 Dimensions Fig 90 Dimensions Technical Specifications 122 417101442 Rev 12 02 2019 ...
Страница 269: ...16 Declaration of Conformity Fig 96 Declaration of Conformity Declaration of Conformity 133 417101442 Rev 12 02 2019 ...
Страница 393: ...14 2 Dimensions Fig 93 Dimensions Données techniques 123 417101442 Rev 12 02 2019 ...
Страница 404: ...16 Déclaration de conformité Fig 99 Déclaration de conformité Déclaration de conformité 134 417101442 Rev 12 02 2019 ...
Страница 405: ......