5
Setup
5.1
EMP KKS E60
Fig. 3: EMP KKS E60 (Front and side view)
5.2
EMP KKS E60
+
Fig. 4: EMP KKS E60
+
(Front and side view)
Pos.
Description
1
Suction valve (connection on the suction side)
2
Diaphragm breakage sequence
3
Venting connection (refeeding into the container)
4
Stroke length adjustment
5
Pump head
6
Pressure valve (connection on the pressure side)
A
Rail for connecting the dongle box
B
Dongle box
è
Flow direction of the metering medium
Setup
28
417101442 Rev. 12-02.2019
Содержание Elados EMP KKS E60
Страница 2: ......
Страница 123: ...14 2 Abmessungen Abb 89 Abmessungen Technische Daten 121 417101442 Rev 12 02 2019 ...
Страница 134: ...16 Konformitätserklärung Abb 95 Konformitätserklärung Konformitätserklärung 132 417101442 Rev 12 02 2019 ...
Страница 135: ......
Страница 258: ...14 2 Dimensions Fig 90 Dimensions Technical Specifications 122 417101442 Rev 12 02 2019 ...
Страница 269: ...16 Declaration of Conformity Fig 96 Declaration of Conformity Declaration of Conformity 133 417101442 Rev 12 02 2019 ...
Страница 393: ...14 2 Dimensions Fig 93 Dimensions Données techniques 123 417101442 Rev 12 02 2019 ...
Страница 404: ...16 Déclaration de conformité Fig 99 Déclaration de conformité Déclaration de conformité 134 417101442 Rev 12 02 2019 ...
Страница 405: ......