![background image](http://html1.mh-extra.com/html/eclipse-combustion/ratioair-ra-series/ratioair-ra-series_installation-manual_3976549013.webp)
Eclipse RatioAir v1 - Installation Guide No. 115, 4/7/06
1
Refractory Block
1.
Be sure the gasket
is installed between the burner
and the block holder
.
2.
Be sure the gasket
is installed between the block holder
and the chamber wall
.
3.
Support the weight of the refractory block
with hard
brick work
. Fill space around the block
with soft
gasket material
3
.
Burner Piping
The burner is factory assembled and shipped as ordered.
Note:
If it is necessary to redirect piping, be sure the:
•
ratio regulator spring column
is pointing up.
•
arrow on the ratio regulator points in the direction of
gas flow.
•
integral fuel orifice and o-rings
are re-installed.
•
same straight run of pipe
remains between the ratio
regulator and the burner .
Supply Piping
Inlet pressure to the ratio regulator must stay within specified
limits. Refer to the appropriate RatioAir data sheet.
•
Locate the valve train close to the burner. The gas must
reach the burner during the fixed trial for ignition.
•
Sufficiently size shut off valves in the valve train.
•
Make sure piping is large enough.
•
Minimize piping elbows.
g
as
p
ipiNg
Refractory Block
Burner Piping
2
9
10
3
8
7
1
4