![Echelon i.LON SmartServer 2.0 Скачать руководство пользователя страница 118](http://html1.mh-extra.com/html/echelon/i-lon-smartserver-2-0/i-lon-smartserver-2-0_repeating-manual_3887645118.webp)
104
Controlling a Street Lighting Network with the Scheduler Application
d.
Repeat steps a–c for additional weekday holiday exceptions to be added to the exception
group.
Notes
:
•
You can click the arrows to scroll through the various exception instances. You can edit the
scope (private or public), dates, and recursions for the selected instance.
•
You can click
Delete
to remove the selected exception instance from the Event Scheduler.
4.
Click
OK
to save exception and return to the
Scheduler: Exception Schedules
Web page.
5.
The range of dates on which the exception is to occur is highlighted light blue and outlined with a
color differentiating it from the other exceptions in the calendar on the
Scheduler: Exception
Schedules
Web page.
Содержание i.LON SmartServer 2.0
Страница 1: ...078 0348 01E i LON SmartServer 2 0 Power Line Repeating Guide...
Страница 14: ...xiv Preface...
Страница 50: ...36 Installing a Power Line Repeating Network...
Страница 144: ...www echelon com...