i
.LON SmartServer 2.0 Power Line Repeating Network Management Guide
99
5.
Click
OK
to return to the
New One-Time Exception
dialog.
6.
Create the sunrise and sundown events for the exception following these steps:
a.
Select the
Show Sunrise/Sunset Functions
check box. A
Function
box appears to the right
of the
Time
boxes under the
To
and
From
properties.
b.
In the
Function
box under the
To
property, select the Sunrise icon (
). The calculated
sunrise time appears in the
Time
box, which becomes read-only, and an
Offset
box is added
to the right of the
Time
box. If the event is to occur sometime before or after sunrise, enter
that period of time in the
Offset
box. For example, if you want a DIMMING event to occur
15 minutes before sunrise, enter -
00:15
c.
In the
Function
box under the
From
property, select the Sundown icon (
). The calculated
sundown time appears in the
Time
box, which becomes read-only, and an
Offset
box is added
to the right of the
Time
box. If the event is to occur sometime before or after sundown, enter
that period of time in the
Offset
box. For example, if you want an ON_100 event to occur 30
minutes after sundown, enter
00:30
.
d.
In the
Value
box, select
OFF
. If OFF does not appear as an option in the list, you can enter
OFF and then create an OFF preset as described in the
Selecting Data Points
section.
e.
In the
Priority
box, enter a priority that is lower than the 255 priority used for the weekday
daily schedule (this example use a priority of
220
). This priority essentially locks out the
events in the weekday daily schedule, which have lower priorities (255).
Содержание i.LON SmartServer 2.0
Страница 1: ...078 0348 01E i LON SmartServer 2 0 Power Line Repeating Guide...
Страница 14: ...xiv Preface...
Страница 50: ...36 Installing a Power Line Repeating Network...
Страница 144: ...www echelon com...