1
.
INTRODUCTION
First of all, we would like to thank you for choosing E.C.A brand. E.C.A.
Confeo
Premix condensing boilers have
been designed to meet for an efficient, safe and comfortable central heating and hot water requirement. The
Confeo
Premix condensing boilers can possibly use natural gas or LPG according to the desired fuel preference.
There is no standard LPG models. LPG usage is only possible after gas conversion in the field.
HM Model (Boiler)
HCH Model (Heat Only)
:
Both Central Heating (CH) and Domestic Hot Water (DHW).
:
Only for Central Heating (CH).
HST Model (System Boiler)
:
Both for Central Heating (CH) and Domestic Hot Water (DHW) with external
storage tank (not included).
The assembly and usage information of
14/20/
24
/28
/30/35 kW
Confeo
Premix condensing boilers are
available in this manual. Detailed information have been provided in the guide regarding the technical
specification of the boiler, selection of the boiler location, fitting its water, gas, flue and electric supply
connections, gas conversion, maintenance information and solving of possible failures. Please carefully read
the manual in order to benefit from all the features of your boiler.
The Benchmark Checklist and Service Record Card are located at the back of the Operating Manual.
The Benchmark Checklist must be filled by gas safe engineer during installation.
Operating Manual and Service Manual must be handed over the user for future operations.
Service Record Card must be filled by gas safe engineer and handed over the user after
each service operation and annual Maintenance.
1.1
.
Installer’s Responsibility
The installer is responsible for the installation and initial start-up
of the boiler. Instructions are given below.
Check Operating and Service manuals and follow instructions before installation.
Carry out installation in compliance with the prevailing legislation and standarts.
Be sure that the system is flushed and inhibitor added.
Only gas safe engineer must operate the boiler.
Explain the user about installation and operation of boiler.
Fill the Comissioning Checklist.
Give all Operating and Service manuals to user.
The warranty certificate must be registered by gas safe engineer within 30 days after installation.
3
Содержание CONFEO PREMIX P 14 HM
Страница 1: ...SERVICE MANUAL CONFEO PREMIX CONDENSING BOILER CONFEO PREMIX P 14 20 24 28 30 35 HM HCH HST...
Страница 24: ...12 ELECTRICAL DIAGRAM Figure 15 24...
Страница 34: ...Low Voltage Removing installing the pump cable FAN PWM CABLE Figure 39 Figure 40 34...
Страница 52: ...Figure 76 Figure 77 52...
Страница 83: ......