Remove the rope that functions as a stopper from the hook on the same side with the frame as shown
in the figure 25 below.
WARNING:
Do not forget to attach the stopper to the point shown in the image before clo
-
sing the front panel.
MMI service cable assembly-disassembly:
In cases where operation is required while the boiler is
in operation, the connection of the service cable shown in the image can be done with the front panel
open.
MMI SERVICE
CABLE
Figure 24
Figure 25
Figure 26
28
Содержание CONFEO PREMIX P 14 HM
Страница 1: ...SERVICE MANUAL CONFEO PREMIX CONDENSING BOILER CONFEO PREMIX P 14 20 24 28 30 35 HM HCH HST...
Страница 24: ...12 ELECTRICAL DIAGRAM Figure 15 24...
Страница 34: ...Low Voltage Removing installing the pump cable FAN PWM CABLE Figure 39 Figure 40 34...
Страница 52: ...Figure 76 Figure 77 52...
Страница 83: ......