
EATON XSTORAGE COMPACT INSTALLATION MANUAL
P-16400097 - September 2020 www.eaton.com
23
7.
After you have removed the shipping brackets, move the unit immediately away from the pallet by
rolling the equipment slowly toward the ramp edge.
Be careful not to push the equipment too much or too fast since it may cause the equipment to tip
over. Note that the equipment is heavy. Make sure that you have enough manpower to handle and
support the equipment while rolling it off the pallet.
8.
Roll the equipment to its final installation location.
9.
Make sure that the rear of the unit is not against a wall that could limit the air flow.
10.
Make sure that there is enough clearance to install the battery packs. For the minimum clearances,
refer to Table 6: xStorage Compact system and battery cabinet minimum clearances.
11.
To secure the unit in position, lower the leveling feet in the corners of the unit until the unit is not
resting on the casters.
12. Adjust the leveling feet to make sure that the unit is level and standing on the leveling feet.