
2018.12.12
© 2017 Eaton. All rights reserved
168
TRSM0940
Service Procedures
|
Main Case Main Shaft Disassembly with Low Force Gearing
11.
Remove the 2nd–3rd Gear Sliding Clutch.
12.
Remove the 4th no-burn washer and 3rd Gear.
13.
Remove the 5th flat no-burn washer from the Main
Shaft.
14.
Remove 4th Gear (5th for direct drive) from the Main
Shaft.
Содержание UltraShift PLUS Series
Страница 2: ...1 2017 Eaton All rights reserved 2019 07 11 General Information TRSM0970...
Страница 4: ......
Страница 5: ...2019 07 11 2017 Eaton All rights reserved 4 TRSM0970 General Information...
Страница 6: ...5 2017 Eaton All rights reserved 2019 07 11 General Information TRSM0970...
Страница 7: ...2019 07 11 2017 Eaton All rights reserved 6 TRSM0970 General Information...
Страница 8: ...7 2017 Eaton All rights reserved 2019 07 11 General Information TRSM0970...
Страница 9: ...2019 07 11 2017 Eaton All rights reserved 8 TRSM0970 General Information...
Страница 10: ...9 2017 Eaton All rights reserved 2019 07 11 General Information TRSM0970...