
17
4. Installation
Option 3: Routing cables from the service compartment and across the cable plenum at the top
of all IT and cooling enclosures.
1
Remove the top horizontal beams of the enclosures you wish to run wire through.
2
Run the cable(s) through the brush strips and across to the neighboring racks
3
(Optional)
Depending on the cable management strategy, run the cable(s) out to the PDU(s) housed in the service
enclosure and through the roof panel’s cable hood.
1
1
2
2
3
3
2