10
3. Configuration
3.2 Placement
IMPORTANT!
Cooling units are top-heavy and can present a tipping hazard if handled incorrectly. Please refer
1.2 Cooling Enclosure Warnings before proceeding with the SRPOD configuration.
Use the casters to move all combined or individual enclosures for a short distance over a level, smooth, stable surface
by pushing it from the front or rear (not the side panels). Do not attempt to roll the enclosures over long distances. The
enclosures should be moved close to their installation location before they are unpacked (use a forklift or pallet jack, if
necessary).
WARNING: Do not push or pull the enclosures at the side panels or pull the enclosures toward you.
3.3 Assembly
The following assembly steps show
sample modular data center model:
SRP-2R-2C12-M.
For this particular model, you will
receive five pallets.
• 2 pallets: Each pallet contains one
IT rack enclosure attached to a
cooling enclosure. The cooling
enclosure contains the InRow
cooling unit pre-installed.