Typical Control Wiring Diagrams 

For a single conductor, a minimum wire of 14 AWG (2.5 mm

2

) should be used between the 

control power transformer and the supply terminals.

Basic Connection Diagram for 120 Vac Three-Wire 
Pushbutton

Basic Connection Diagram for 120 Vac Network Control

Basic Connection Diagram for 120 Vac Two-Wire 
Pushbutton

Terminal Block Wiring Capacity 

Reset

E-Stop

Maintained

Momentary

Ground

+24V

D0

D1

Common

N–T

ap

Neutral

L–T

ap

Line

Start

Stop

TB1

120 Vac

Supply

User Interface 

Module

TB4

Comms Port A

98 97 96 13 14

Comms Port B

TB5 (Connector)

TB2

Relays

TB3

120 Vac
Control

Relay 2

Relay 1

N–Network

L–Network

N–Permissive

L–Permissive

N–Start

L–Start

N–Reset

L–Reset

Reset

E-Stop

Maintained

Momentary

Comms Adapter

Comms

Modbus

TB4

DeviceNet

Modbus

PROFIBUS

TB5 (Module)

Ground

+24V
D0

D1
Common

N–T

ap

Neutral

L–T

ap

Line

Run Enable

Network

TB1

120 Vac

Supply

User Interface 

Module

Comms Port B

TB5 (Connector)

TB4

Comms Port A

TB2

Relays

TB3

120 Vac
Control

98 97 96 13 14

N–Network

L–Network

N–Permissive

L–Permissive

L–Start

N–Startl

N–Reset

L–Reset

Relay 2

Relay 1

Wire Size 

Number of 
Conductors 

Torque 
Requirements 

22–16 AWG (0.33–2.5 mm

2

3.5 lb-in (0.4 Nm) 

14–12 AWG (4.0 mm

2

3.5 lb-in (0.4 Nm) 

Maintained

Momentary

Reset

E-Stop

Start/Run

98 97 96 13 14

Ground

+24V

D0

D1

Common

N–T

ap

Neutral

L–T

ap

Line

TB1

120 Vac

Supply

User Interface 

Module

TB4

Comms Port A

Comms Port B

TB5 (Connector)

TB2

Relays

TB3

120 Vac
Control

Relay 2

Relay 1

N–Network

L–Network

N–Permissive

L–Permissive

N–Start

L–Start

N–Reset

L–Reset

www.comoso.com

Содержание S611

Страница 1: ...S611 Soft Starter Quick Start Installation Guide Effective January 2012 Supersedes June 2011 www comoso com...

Страница 2: ...www comoso com...

Страница 3: ...MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECO...

Страница 4: ...E 386 2273 8 00 a m 6 00 p m EST FAX 800 752 8602 After Hours Emergency 800 543 7038 6 00 p m 8 00 a m EST If you are in the U S or Canada and have OI or PLC questions you can take advantage of our to...

Страница 5: ...tarter Do not attempt to lift the soft starter by the cover only Lug Installation Install the lugs below the bus bar to assure anti rotation Refer to figure Lug and Bolt Torque Support on this page Po...

Страница 6: ...ze Number of Conductors Mechanical Lug Ilsco Part Number Torque lb in Mechanical Lug Range Soft Starter Catalog Number Mechanical Lug Eaton Catalog Number 52A 6 AWG 1 TA 2 0 120 14 AWG 2 0 S611A052XXX...

Страница 7: ...ting Hole Dimensions Approximate Dimensions in mm Inches Frames A through D Frames E and F 70 0 2 76 464 7 18 30 110 0 4 33 10 0 0 39 70 0 2 76 80 0 3 15 90 0 3 54 80 0 3 15 155 0 6 10 562 0 22 13 10...

Страница 8: ...ive L Permissive N Start L Start N Reset L Reset Reset E Stop Maintained Momentary Comms Adapter Comms Modbus TB4 DeviceNet Modbus PROFIBUS TB5 Module Ground 24V D0 D1 Common N Tap Neutral L Tap Line...

Страница 9: ...on Operation LED list Navigates through display parameter list in Monitor mode Edit Save Selects Saves parameter values in Protection Operation modes Selects Advanced Con g Menu parameters Selects Sav...

Страница 10: ...rt time elapses Verify that the motor is not overloaded After suitable performance has been achieved with either method determine the starting time to bypass and set Soft Start Time at 1 25 times this...

Страница 11: ...45 67 Default value 36 60 33 57 Wye delta equivalent 27 52 19 44 Minimum for current limit 14 37 9 30 1 10 Minimum Application t Start t Stop u Start Breakaway Torque Remarks Crusher empty at start 20...

Страница 12: ...ch network controller verify that the unit is recognized by the system controller Comms Port B adapter module failed or disconnected 15 Power Pole Over Temperature SCR temperature is above limits Oper...

Страница 13: ...Incoming AC line voltage below trip threshold Incorrect mains supply voltage Connect to correct supply voltage Verify that mains voltage is within acceptable values Verify Motor Rated Voltage in the...

Страница 14: ...imbalance problem with mains Increase the Voltage Fault Imbalance parameters Disable the fault if the other issues cannot be resolved 33 Jam Soft starter in bypass Motor below rated RPM and or current...

Страница 15: ...www comoso com...

Страница 16: ...liable efficient and safe power is available when it s needed most With unparalleled knowledge of electrical power management across industries experts at Eaton deliver customized integrated solutions...

Отзывы: