The S611 Operation and Protection parameters may be 
edited when 120 Vac control power is applied to 120 Vac 
supply (TB1). Mains power is not required to edit and 
save Operation and/or Protection parameters.

2.

If any 120 Vac power source other than the normal system 
control power source is used to power the control circuit to 
edit parameters, connections must be made in compliance 
with all local, state, and national electrical codes.

3.

To setup the S611 Operating parameters (Operation 
mode), perform the following steps:

a.

Enter motor FLA. 

b.

Enter motor rated voltage.

c.

Select start method if required (default = voltage 
ramp, or pump start).

d.

Enter Start time from table on 

Page 7

 (default = 

20 seconds).

e.

Enter initial torque from table on 

Page 7

 (default = 

45%).

f.

Enter Stop time, Kick Start time, and Kick Start 
torque if desired (default = 0).

4.

Application Notes 

Adjust 

Initial Torque

 for smooth start, motor rotation 

should begin within 2 seconds. 

If Stall Faults occur at the end of the ramp time, increase 

Initial Torque, Kick Start Torque and Time and/or Soft 
Start Time

 to achieve bypass before the Soft Start time 

elapses. Verify that the motor is not overloaded. 

After suitable performance has been achieved with either 
method, determine the starting time to bypass and set 

Soft Start Time

 at 1.25 times this time. For example, if it 

takes 10 seconds to accelerate the motor and go into 
bypass, set the 

Soft Start Time

 for 12.5 seconds. 

5.

In the Protection Mode, set the Protection parameters 
to the desired values. Refer to table on 

Page 7

.

6.

For optional advanced configuration parameters refer to 
the user manual.

Operating Parameters

Notes

For the device with pump option, the default value is 2 for pump start.

Operating Parameter

Units

Min

Max

Default

Notes

Motor FLA

Amps

Motor FLA parameter must be set to 
motor nameplate FLA to achieve 
proper overload protection

Frame Size A–52

26

52

26

Frame Size A–65

32.5

65

32.5

Frame Size A–77

38.5

77

38.5

Frame Size B–99

48

99

48

Frame Size B–125

62.5

125

62.5

Frame Size C–156

78

156

78

Frame Size C–180

90

180

90

Frame Size D–242

120

242

120

Frame Size E–302

151

302

151

Frame Size E–361

180.5

361

180.5

Frame Size F–414

207

414

207

Motor rated voltage

Volts

200

600

480

Start method

0

2

0

0

 = Voltage ramp

1

 = Current limit

2

 = Pump start (option)

Start time 

Seconds

0.5

180

20

Initial torque

%

0

100

45

Stop time

Seconds

0

60

0

Kick start time

Seconds

0

2

0

Kick start torque

%

0

100

0

Auto reset mode

0

1

0

0

 = Manual

1

 = Auto

Advanced config

Refer to User Manual, Publication No. 
MN03902011E

www.comoso.com

Содержание S611

Страница 1: ...S611 Soft Starter Quick Start Installation Guide Effective January 2012 Supersedes June 2011 www comoso com...

Страница 2: ...www comoso com...

Страница 3: ...MERCHANTABILITY OTHER THAN THOSE SPECIFICALLY SET OUT IN ANY EXISTING CONTRACT BETWEEN THE PARTIES ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF EATON THE CONTENTS OF THIS DOCUMENT SHALL NOT BECO...

Страница 4: ...E 386 2273 8 00 a m 6 00 p m EST FAX 800 752 8602 After Hours Emergency 800 543 7038 6 00 p m 8 00 a m EST If you are in the U S or Canada and have OI or PLC questions you can take advantage of our to...

Страница 5: ...tarter Do not attempt to lift the soft starter by the cover only Lug Installation Install the lugs below the bus bar to assure anti rotation Refer to figure Lug and Bolt Torque Support on this page Po...

Страница 6: ...ze Number of Conductors Mechanical Lug Ilsco Part Number Torque lb in Mechanical Lug Range Soft Starter Catalog Number Mechanical Lug Eaton Catalog Number 52A 6 AWG 1 TA 2 0 120 14 AWG 2 0 S611A052XXX...

Страница 7: ...ting Hole Dimensions Approximate Dimensions in mm Inches Frames A through D Frames E and F 70 0 2 76 464 7 18 30 110 0 4 33 10 0 0 39 70 0 2 76 80 0 3 15 90 0 3 54 80 0 3 15 155 0 6 10 562 0 22 13 10...

Страница 8: ...ive L Permissive N Start L Start N Reset L Reset Reset E Stop Maintained Momentary Comms Adapter Comms Modbus TB4 DeviceNet Modbus PROFIBUS TB5 Module Ground 24V D0 D1 Common N Tap Neutral L Tap Line...

Страница 9: ...on Operation LED list Navigates through display parameter list in Monitor mode Edit Save Selects Saves parameter values in Protection Operation modes Selects Advanced Con g Menu parameters Selects Sav...

Страница 10: ...rt time elapses Verify that the motor is not overloaded After suitable performance has been achieved with either method determine the starting time to bypass and set Soft Start Time at 1 25 times this...

Страница 11: ...45 67 Default value 36 60 33 57 Wye delta equivalent 27 52 19 44 Minimum for current limit 14 37 9 30 1 10 Minimum Application t Start t Stop u Start Breakaway Torque Remarks Crusher empty at start 20...

Страница 12: ...ch network controller verify that the unit is recognized by the system controller Comms Port B adapter module failed or disconnected 15 Power Pole Over Temperature SCR temperature is above limits Oper...

Страница 13: ...Incoming AC line voltage below trip threshold Incorrect mains supply voltage Connect to correct supply voltage Verify that mains voltage is within acceptable values Verify Motor Rated Voltage in the...

Страница 14: ...imbalance problem with mains Increase the Voltage Fault Imbalance parameters Disable the fault if the other issues cannot be resolved 33 Jam Soft starter in bypass Motor below rated RPM and or current...

Страница 15: ...www comoso com...

Страница 16: ...liable efficient and safe power is available when it s needed most With unparalleled knowledge of electrical power management across industries experts at Eaton deliver customized integrated solutions...

Отзывы: