TABLE OF CONTENTS
Eaton 9395 UPS (450–825 kVA) Installation and Operation Manual
S
164201725 Rev 4
www.eaton.com/powerquality
v
List of Figures
Figure 1‐1. Eaton 9395 Three UPM UPS (650–825 kVA)
1-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1‐2. Eaton 9395 Plus 1 UPS (650–825 kVA) with the Field Installed UPM
1-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1‐3. Eaton 9395-825/550 Two UPM UPS (450–550 kVA)
1-3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 1‐4. Eaton 9395-825/550 Two UPM UPS with the Field Installed UPM (450–825 kVA)
1-3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐1. UPS Cabinet Dimensions – Three UPM (Front View)
3-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐2. UPS Cabinet Dimensions – Two UPM (Front View)
3-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐3. UPS Cabinet Dimensions (Right Side View)
3-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐4. ISBM Section Dimensions (Front View)
3-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐5. UPM Section Dimensions – Three UPM (Front View)
3-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐6. UPM Section Dimensions – Two UPM (Front View)
3-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐7. ISBM Section Dimensions (Top View)
3-7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐8. ISBM Section Dimensions (Bottom View)
3-7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐9. UPM Section Dimensions – Three UPM (Top View)
3-8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐10. UPM Section Dimensions – Two UPM (Top View)
3-8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐11. ISBM Section Center of Gravity – Momentary Static Switch
3-9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐12. ISBM Section Center of Gravity – Continuous Static Switch
3-9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐13. UPM Section Center of Gravity – Three UPM
3-10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐14. UPM Section Center of Gravity – Two UPM
3-10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐15. Remote EPO Switch Dimensions
3-11
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐16. UPS Cabinet as Shipped on Pallet (ISBM Section)
3-30
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐17. UPS Cabinet as Shipped on Pallet (UPM Section – Three UPM)
3-31
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 3‐18. UPS Cabinet as Shipped on Pallet (UPM Section – Two UPM)
3-32
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐1. Removing the ISBM Section Left Side Shipping Bracket
4-2
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐2. Removing the ISBM Section Right Side Shipping Bracket
4-3
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐3. Removing the Three UPM Section Left Side Shipping Bracket
4-4
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐4. Removing the Three UPM Section Right Side Shipping Bracket
4-5
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐5. Removing the Two UPM Section Left Side Shipping Bracket
4-6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐6. Removing the Two UPM Section Right Side Shipping Bracket
4-7
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐7. Section Joining (Three UPM Section Shown)
4-8
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐8. ISBM and UPM Sections Joined (Three UPM Section Shown)
4-9
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐9. ISBM Section to UPM Section Joining Brackets
4-10
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐10. ISBM Section Intercabinet Power Terminal Locations – Common Rectifier Feed, Momentary Static Switch
4-14
. . . . . . . . . . . .
Figure 4‐11. ISBM Section Input Power Terminal Detail – Common Rectifier Feed, Momentary Static Switch
4-15
. . . . . . . . . . . . . . . . . . . .
Figure 4‐12. ISBM Section Intercabinet Power Terminal Locations – Common Rectifier Feed, Continuous Static Switch
4-16
. . . . . . . . . . . .
Figure 4‐13. ISBM Section Input Power Terminal Detail – Continuous Static Switch
4-17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐14. ISBM Section Intercabinet Power Terminal Locations – Separate Rectifier Feed, Momentary Static Switch
4-18
. . . . . . . . . . . .
Figure 4‐15. ISBM Section Input Power Terminal Detail – Separate Rectifier Feed, Momentary Static Switch
4-19
. . . . . . . . . . . . . . . . . . .
Figure 4‐16. ISBM Section Battery Input Power Terminal Detail
4-20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐17. ISBM Section Output Power Terminal Detail
4-20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐18. UPS Intercabinet Interface Harness Locations
4-21
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐19. Pl1 Interface Board Location
4-22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Figure 4‐20. J39 Location on Pl1 Interface Board
4-22
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Содержание Powerware 9395
Страница 2: ......
Страница 28: ...Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality 2 2 ...
Страница 134: ...Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality 5 20 ...
Страница 254: ...WARRANTY Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality W 2 ...
Страница 255: ......
Страница 256: ... 1642017254 164201725 4 ...