UPS OPERATING INSTRUCTIONS
Eaton 9395 UPS (450–825 kVA) Installation and Operation Manual
S
164201725 Rev 4
www.eaton.com/powerquality
7-10
Table 7‐3. Display Menu Operation (continued)
Operation
Subfunction
Function
Com Port Setup
The COM Setup screen is used to change and save the settings for the selected serial
communication port. The COM port number selected from the COM Port Setup screen displays.
If the changes are not wanted, use the
ABORT
pushbutton to return to the COM Port Setup
screen. Use the up or down arrow pushbutton to highlight the setting to be changed. Use the
return arrow pushbutton to toggle through the values for the setting to make the change. Press
SAVE
or
ABORT
. Once the action is completed, the COM Port Setup screen is displayed.
Controls
See paragraph 7.2.8 for details.
7.2.7
Load Off Screen
The Load Off screen (Figure 7‐6) is displayed when the LOAD OFF pushbutton is
selected from the main menu bar, the UPS Control Command screen, or the Bypass
Control Command screen. This screen allows the LOAD OFF process to be aborted if
the LOAD OFF pushbutton was pressed accidentally. For Load Off procedures, see
paragraph 7.3.24 on page 7-27 or paragraph 7.4.27 on page 7-49.
HOLD LOAD OFF BUTTON FOR 3 SECONDS
TO TURN OFF LOAD
LOAD OFF
CANCEL
Figure 7‐6. Load Off Screen
Содержание Powerware 9395
Страница 2: ......
Страница 28: ...Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality 2 2 ...
Страница 134: ...Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality 5 20 ...
Страница 254: ...WARRANTY Eaton 9395 UPS 450 825 kVA Installation and Operation Manual S 164201725 Rev 4 www eaton com powerquality W 2 ...
Страница 255: ......
Страница 256: ... 1642017254 164201725 4 ...