UPS Setup
12
Eaton 9355 UPS (20/30kVA) Installation and Operation Manual 164201626—Rev F
www.eaton.com/powerquality
Unloading the Cabinet(s)
The following tools are required for unloading the cabinet(s):
l
15 mm wrench or socket
l
7 mm nut driver or socket
l
Adjustable wrench or channel-locks
CAUTION
The UPS and
optional cabinets
are heavy (see page 9). Unloading the cabinets requires at least two
people to safely remove the cabinets from the pallet.
To remove the UPS or optional cabinets from the shipping pallet:
1.
Remove the two M10 bolts securing the rear shipping bracket to the pallet (see Figure 4).
2.
Remove the four M8 screws securing the rear shipping bracket to the cabinet rear panel and remove the
bracket. Retain the hardware for later use.
Note:
Be sure to retain the rear shipping bracket and hardware for later re-assembly if you plan to
permanently mount the cabinet.
Figure 4. Removing the Rear Shipping Bracket (UPS Shown)
M8
S
crews
M10 Bolts
Содержание Powerware 9355
Страница 1: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Страница 99: ......
Страница 100: ...164201626 D 164201626 F...