Communication
Eaton 9355 UPS (20/30kVA) Installation and Operation Manual 164201626—Rev F
www.eaton.com/powerquality
57
Figure 43. RMP Dimensions
To install an RMP:
Note:
If mounting to a hollow wall, secure the enclosure bottom to a wood or metal stud within the wall. Do
not use hollow wall anchors. The RMP can also be mounted to a single- or double-gang electrical box.
1.
If wall mounting, securely mount the RMP. Continue to Step 2.
If desk mounting, install the provided bumpers to the bottom of the RMP enclosure. Proceed to Step 3.
2.
Install 1/2” conduit from the RMP to the IRC through the cable exit openings (see Figure 43). Proceed to
Step 4.
3.
Install wiring from the RMP to the IRC using the cable listed in Table 3 and the provided strain relief
bushings in the cable exit openings in the IRC (see Figure 45) and the RMP.
4.
Connect the wiring between the RMP and the IRC plug-in terminal blocks using terminations shown in
Table 3. See Figure 44 and Figure 45 for plug-in terminal block locations.
Mounting
S
lots
(6 places)
NOTE
Matches mounting holes on a single- or
double-gang electrical box.
Cable Exit Openings
for 1/2” Conduit or
Provided
S
train Relief
(3 places)
Dimensions are in mm [inches]
Содержание Powerware 9355
Страница 1: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Страница 2: ......
Страница 3: ...Eaton 9355 UPS 20 30 kVA Installation and Operation Manual...
Страница 99: ......
Страница 100: ...164201626 D 164201626 F...