100
Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725—Rev 15
55..33
IInnssttaalllliinngg D
Diissttrriibbuutteedd B
Byyppaassss C
Coonnttrrooll W
Wiirriinngg
NOTE 1
When installing external wiring to the Powerware Hot Sync CAN Bridge Card, conduit
must be installed to the UPS cabinet. When installing internal wiring to the Powerware
Hot Sync CAN Bridge Card terminals, route the wiring through the internal opening in
the X-Slot communication bay.
NOTE 2
When installing interface wiring for the pull chain, conduit must be installed between
UPSs.
To install distributed bypass control wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
for shutdown instructions.
2.
Perform the procedure listed in paragraph
Installing an Optional Powerware Hot Sync CAN Bridge Card
.
3.
Terminal block TB3 is accessible on the left side of the X-Slot communication bay (see
). To gain
access to terminal block TB1, TB2, and the left interface entry conduit landing plates, loosen the screws
securing the small top internal safety shield panel and remove the panel. This panel is to the right of the X-
Slot communication bay (see
). Retain the hardware for later use.
4.
Remove the interface entry conduit landing plates to drill or punch holes (see
5.
Reinstall the interface entry plates and install the conduit.
6.
To locate the appropriate terminals and review the wiring and termination requirements, see paragraph
UPS System Interface Wiring Preparation
, and
through
7.
Route and install CAN wiring between the UPS cabinets. See
Installing an Optional Powerware Hot Sync CAN Bridge Card
and
for the Powerware Hot Sync
CAN Bridge Card terminal location and ,
, and
for wiring information.
8.
If a tie cabinet with Module Output Breakers (MOBs) is being wired, proceed to Step 11; otherwise,
proceed to Step 9.
9.
Route and install distributed bypass system pull-chain wiring between the UPS cabinets. See
and
for wiring information.
10. Proceed to Step 12.
11. Route and install distributed bypass system pull-chain wiring between the UPS cabinets and tie cabinet
MOBs. See
and
for wiring information.
NOTE
Setup of the Powerware Hot Sync CAN Bridge Card for parallel operation must be
performed by an authorized Eaton Customer Service Engineer. Contact an Eaton service
representative to schedule a date.
12. Reinstall the small top internal safety shield panel and secure with the cabinet mounted screws.
13. Close the front door and secure the latch.
Содержание Power Xpert 9395
Страница 8: ......
Страница 20: ...xx Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 List of Figures ...
Страница 37: ...14 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 Safety Warnings ...
Страница 137: ...114 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 Installing Options and Accessories ...
Страница 175: ...152 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 Understanding UPS Operation ...
Страница 249: ...226 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 UPS Operating Instructions ...
Страница 257: ...234 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 Communication ...
Страница 265: ...242 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 UPS Maintenance ...
Страница 268: ...Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201725 Rev 15 245 Product Specifications ...
Страница 269: ...16420172515 164201725 15 ...