background image

6

Eaton PDI WaveStar Color Monitor Setup and Operation Manual P-164001109—Rev 01

[email protected]

22..66

W

Waarrrraannttyy

To view the warranty please click on the link or copy the address to download from the Eaton website:

Eaton Product Warranty

https://www.eaton.com/content/dam/eaton/products/backup-power-ups-surge-it-power-distribution/backup-
power-ups/portfolio/eaton-three-phase-ups-warranty.pdf

Introduction

Содержание PDI WaveStar

Страница 1: ...p n P 164001109 Revision 01 Setup and Operation Manual Eaton PDI WaveStar Color Monitor...

Страница 2: ...ns as well as to ensure optimal performance of your Eaton PDI WaveStar Color Monitor please carefully read the instructions before trying to install operate service or maintain the system For any ques...

Страница 3: ...of threats including power outages surges lighting strikes and enable you to monitor and control your power infrastructure We trust that your Eaton Uninterruptible Power Supply system and Accessory Pr...

Страница 4: ......

Страница 5: ...2 Cable Biasing and Termination 9 3 4 Ethernet Cables 10 3 5 Customer Modbus RTU Connections 10 3 5 1 Power Distribution Unit PDU 10 3 5 2 Remote Power Panel RPP 11 3 5 3 JCOMM 12 3 6 Modbus Addressin...

Страница 6: ...6 BCMS IEC Readings 34 6 7 Circuit Breaker Status Board Readings 36 7 7 A Alla ar rm ms s a an nd d T Tr ro ou ub blle es sh ho oo ot tiin ng g 3 37 7 7 1 Summary Alarm Indicators 37 7 2 Alarm Screen...

Страница 7: ...ormation 19 Figure 16 Initial Device List 21 Figure 17 Settings PDU Device 22 Figure 18 Settings Enhanced Subfeeds ESF 23 Figure 19 Settings BCMS Device 24 Figure 20 Settings BCMS Subfeeds 25 Figure 2...

Страница 8: ...viii Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 List of Figures...

Страница 9: ...Table 1 Pin Out for Modbus Headers 8 Table 2 Monitor Alarms 39 Table 3 General PDU Alarms 40 Table 4 PDU Transformer Input 40 Table 5 PDU Transformer Output 41 Table 6 Contractor Board Alarms 42 Tabl...

Страница 10: ...x Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 List of Tables...

Страница 11: ...n qualified personnel to operate service or maintain the equipment discussed Disconnect and lock out all power supplying equipment before working on or installing WaveStar Color Monitor components Use...

Страница 12: ...2 Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 Safety...

Страница 13: ...e power monitoring station Figure 1 shows the Monitor used in a JCOMM Figure 1 WaveStar Color Monitor Installed in a JCOMM NOTE The term PDI in this manual refers to products previous manufactured by...

Страница 14: ...rameters such as number of devices in Monitor s chain Device SETTINGS Device specific parameters such as user specified device name DEVICES Device Name SETTINGS SOFTWARE VERSIONS a list of software ve...

Страница 15: ...ntering Alphanumeric Data Touch ENTER to complete the operation Touch Cancel to terminate the operation Touch here to toggle between Symbol and Letters keyboards 2 2 5 5 G Ge et tt tiin ng g H He ellp...

Страница 16: ...W Wa ar rr ra an nt ty y To view the warranty please click on the link or copy the address to download from the Eaton website Eaton Product Warranty https www eaton com content dam eaton products bac...

Страница 17: ...supporting these protocols Modbus RTU Ethernet port TCP IP used by the web page server see Chapter 8 Web Pages Modbus TCP IP SNMP Version 1 3 3 2 2 M Mo on niit to or r N Ne et tw wo or rk k C Co on...

Страница 18: ...W4 downstream Upstream and downstream chains can be differently configured For 2 wire configuration At least one device in a device chain must have both jumpers jumped on its Modbus connection If any...

Страница 19: ...ith two 2 twisted pairs and a shield ground wire The two transmit lines must be in one twisted pair and the two receive lines in the other twisted pair 2 wire cabling RS485 is typically 2 wire and is...

Страница 20: ...customer does not typically wire Modbus RTU directly to the Monitor Downstream Modbus RTU links are typically to internal devices and are wired at the factory The upstream Modbus RTU link is extended...

Страница 21: ...a an ne ell R RP PP P Figure 8 Modbus RTU Customer Connection RPP Upstream In RPPs the Color Monitor upstream Modbus connection is brought to a terminal block for convenient customer connection Downst...

Страница 22: ...the customer Modbus RTU connections are made to the JCOMM Connections Panel on the left inside of the unit Figure 9 JCOMM Modbus Connections TX TX RX RX Common TX TX RX RX Common Modbus Plug Modbus P...

Страница 23: ...to 255 but you must leave enough addressing capacity for downstream devices The monitor will not respond to a command sent to address 0 The address is set in Monitor Setup See paragraph 4 2 3 TCP IP a...

Страница 24: ...ommon for a system to be one register off Because adjacent registers often have similar readings being one register off is not necessarily apparent Most analog values are 2 byte integers representing...

Страница 25: ...T TU UP P M Miis sc ce elllla an ne eo ou us s P Pa ar ra am me et te er rs s Touch SETUP to display buttons for several configuration items see Figure 11 A password is required to access and change s...

Страница 26: ...r of Devices should equal the number of devices in the Monitor s device chain Up to twenty 20 devices are allowed The Monitor uses this number to determine how many devices to search for in its downst...

Страница 27: ...tor Address is the address that the upstream Modbus client such as the Building Management System BMS uses to address the Monitor The downstream device addresses are incremented sequentially from this...

Страница 28: ...Figure 4 on the Monitor using a standard Ethernet cable For SNMP setup on the SETUP screen touch NETWORK SNMP to display the network parameters for SNMP see Figure 11 and Figure 14 In addition to the...

Страница 29: ...h the Monitor is installed such as PDU 182 Touch MODEL to enter the model number A keyboard appears requesting the password Enter VNUP If password is accepted a second keyboard appears asking you to e...

Страница 30: ...20 Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 Setup Monitor and Network...

Страница 31: ...he Monitor s device chain has a unique Modbus address a device type that is identified by its Modbus server ID and its own points list Modbus register map Figure 16 Initial Device List The initial dev...

Страница 32: ...e configuration These settings provide information to the Monitor in addition to each device s own internal setup Device settings will usually be entered by PDI manufacturing or service representative...

Страница 33: ...10 if ABCN have CTs BCMS notifies Color Monitor if neutrals have CTs Touch to set VERSION number for ESF board software The new VERSION number appears in the SOFTWARE VERSIONS list 5 5 2 2 3 3 B BC C...

Страница 34: ...ct touch BCMS KWH device name in DEVICES list Device name turns blue when selected 5 5 2 2 4 4 B BC CM MS S C CB B S Su ub bf fe ee ed ds s S Se et tt tiin ng gs s In addition to its panelboard distri...

Страница 35: ...aracters The device name is propagated to the header and device list Device name should be unique so that alarms can be associated with a specific device Set version Touch VERSION box to enter softwar...

Страница 36: ...gs BCMS IEC Available Settings Touch NAME box to bring up keyboard where you can enter the Device NAME up to 16 characters The device name is propagated to the header and device list Device name shoul...

Страница 37: ...in the Monitor s device chain has a READINGS screen chain providing power monitoring information Select touch DEVICES to see the device list and then READINGS Use PREVIOUS NEXT to step through the scr...

Страница 38: ...e ee ed ds s E ES SF F R Re ea ad diin ng gs s Readings from an Enhanced Subfeeds ESF device are typically power measurements and alarms for high amperage PDU circuits that are subfeeds to other PDUs...

Страница 39: ...name Users can change the device name in SETTINGS Touch READINGS to see the first screen of ESF power monitoring data NO Circuits are numbered 1 14 and broken out by phase 1A 1B 1C Instantaneous measu...

Страница 40: ...breaker rating A MIN Minimum current read A after first registering minimum current MAX Maximum current read A ZERO OK Current has not read 0 after registering a current ACTIVE Current has read 0 afte...

Страница 41: ...t WARNING OK No warning outstanding ACTIVE warning outstanding ALARM OK No alarm outstanding ACTIVE Alarm is outstanding Panelboard totals using main feeds or BCMS computed measurements PB Amps Total...

Страница 42: ...ame in SETTINGS Select READINGS to display panelboard power data Scroll among READINGS pages using PREVIOUS NEXT buttons Panelboard Circuits Instantaneous Readings NO Circuit Number scroll through 42...

Страница 43: ...load as specified by user in points list Both PBs Sum of phase ABCN measurements for both panelboards not available if PBs operate at different voltages Frequency Measurement in Hz 6 6 5 5 B BC CM MS...

Страница 44: ...eds Current phases ABCNG Maximum current phases ABC Points list options let you choose monitoring for Sub distribution feeds 1 and or 2 Phases ABC Neutral optional Ground optional In this example subf...

Страница 45: ...factor KWH Kilowatt Hours Panelboard Circuits Measurements and Alarms NO Circuit Number AMPS Amperes CB Circuit breaker rating Amps MIN Lowest current read MAX Highest current read ZERO OK Current ha...

Страница 46: ...r is tripped Figure 30 Readings Circuit Breaker Status Board Touch the Circuit Breaker Status Board device name in the device name list CB Status Device name turns blue when selected and device name d...

Страница 47: ...signals a summary alarm whenever any alarm is present in the Monitor s device chain see Figure 39 7 7 2 2 A Alla ar rm m S Sc cr re ee en n a an nd d A Alla ar rm m L Liis st t On any screen touch the...

Страница 48: ...e panelboard Device Name BCMS KWH device generic panelboard device with KWH points list Device Name should be changed from generic name to user specified name on the device s SETTINGS screen Touching...

Страница 49: ...as ACTIVE under ZERO WARNING or ALARM Review information for that circuit on all of the device s screens 7 7 3 3 A Alla ar rm ms s b by y D De ev viic ce e T Ty yp pe e Each device has its own alarm s...

Страница 50: ...round current above preset level 10A causes breaker trip normally disabled enable as option Phase Rotation Trip Incorrect phase rotation causes breaker trip normally disabled enable as option Over Vol...

Страница 51: ...ints list Output Voltage AN Low Output voltage AN measures below threshold level in points list Output Voltage BN High Output voltage BN measures above threshold level in points list Output Voltage BN...

Страница 52: ...b bf fe ee ed ds s A Alla ar rm ms s Alarm Alarm Description CB N Zero Current N 1 14 Circuit N has lost current after previously measuring a minimum current CB N High Current Warning N 1 14 Circuit N...

Страница 53: ...Circuit Breaker N Tripped Circuit Breaker has tripped 7 7 4 4 T Tr ro ou ub blle es sh ho oo ot tiin ng g Table 10 Troubleshooting Guide Symptom Probable Cause Remedy Touch Screen does not respond to...

Страница 54: ...larms are listed under Active alarms Go to the Alarms Screen and press CLEAR ALL It takes a few seconds to clear all alarms If the Alarms persist check the downstream device Monitor displays or 65536...

Страница 55: ...your browser then enter to display the start or Home page Figure 34 Web Pages Home Page Each web page has three buttons Click Home to return to Color Monitor Home page Click Devices to display a list...

Страница 56: ...Click a device line to bring up the web pages for the device Device Status Summary Green OK no alarms Yellow Warning Red Alarm Black Alarms Not Applicable The first device in the Devices list see Figu...

Страница 57: ...isplay Device The remaining devices have monitoring data Click the PDU device line brings up the PDU M4G acquisition board web page M4GACK see Figure 37 Click Device 3 BCMS ESF in the Web Pages Device...

Страница 58: ...48 Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 Figure 37 Web Pages PDU Board Web Pages...

Страница 59: ...Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 49 Figure 38 Web Pages Enhanced Subfeeds Web Pages...

Страница 60: ...50 Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 Web Pages...

Страница 61: ...e set of sub distribution feeds BCMS ESF Enhanced Subfeeds Points list for large PDU subfeeds e g 250A BCMS IEC BCMS points list for IEC format panelboards with 36 or 72 1P circuits BCMS KWH Points li...

Страница 62: ...52 Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 Glossary...

Страница 63: ...rds with 36 or 72 1P circuits is 72 BCMSII plus points list Europe KWH For PDU points lists Contact Eaton Service See paragraph Once the software file is received unzip the file and open the directory...

Страница 64: ...54 Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 Bibliography...

Страница 65: ...120V AC 230V AC and 24VDC 230V is optional and requires a different transformer Modbus connections Downstream to Monitor device chain is always 4 wire Modbus Upstream is 4 wire or 2 wire jumper selec...

Страница 66: ...I Part Number 15174 Caution The battery used in this device may present a risk of fire or chemical burn hazard if mistreated Do not recharge disassemble heat above 100 C 212 F or incinerate Replace ba...

Страница 67: ...Eaton PDI WaveStar Color Monitor Setup and Operation Manual P 164001109 Rev 01 57 Appendix Color Monitor Backpanel...

Страница 68: ...P 16400110901 P 164001109 01...

Отзывы: