Verify Interior depth adjustment - Using a non-conducting, 

insulated straight edge, verify dimension from the front 

surface of the dead-front cover mounting bracket. This 

should not be less than 11/16” (0.6875”). See Fig. E. If 

adjustments are required, remove interior and readjust 

depth as per previous steps.

Installation of Incoming Panelboard Connections 

Main incoming connections (mains, neutral and ground).

otee:

N

As a minimum, all panelboard connections are rated 

for use with 75°C or higher rated conductors. When 

wire is used with temperature ratings above 75°C, 

it shall be sized based on the ampacity of wire rated 

75°C.

Wire/Cabling

Mechanical setscrew lugs are typically supplied for incoming 

cable connection. 
Using appropriate tools, the installer must strip the 

conductor insulation sufficiently to fill the entire barrel of the 

connector with bare, non-insulated conductor.
Conductor must be stripped without damage to the 

conductor strands. Bare strands should be of equal length 

(flush) on the end cut. Do not strip off more insulation 

than needed. Exposure of bare conductor outside lug can 

compromise clearances. The connector and conductor 

should be free of all foreign debris. Never clip cable/wire 

strands in order to fit within connectors. If cable/wire 

does not match the rating of the connector, contact the 

manufacturer. Use an antioxidant compound, if required. 

Insert bare conductor into lug so the bare conductor fills 

the full length of the lug body. Tighten lug, then torque to 

levels indicated on the panelboard label. If compression lugs 

are utilized and supplied with the panelboard, the lugs will 

be mounted on the incoming lug pad. Remove lugs from 

the pad. Use an antioxidant compound, if required. Use a 

crimping tool approved for that specific lug manufacturer 

and lug size.
Follow instructions provided by the manufacturer of the 

crimp tool. Once the lug is affixed to the conductor, re-install 

the lug on the lug pad utilizing the existing hardware. Torque 

hardware using information provided in Appendix Table 4 for 

torque values.
To ensure retrofit interior mounting pan is sufficiently 

bonded to ground, a minimum of 1 existing mounting stud 

should be used to mount the chassis. If this is not feasible, 

install the supplied bonding wire and lug to assembly 

between one of the chassis ground bars to the enclosure. 

You may be required to drill and tap a #10-32 hole.  Use 

hardware supplied with interior.
Connect all load grounds
Connect all load neutrals.

Connect all loads

Trim Installation

Install dead-front cover to the rear of trim with supplied 

#10-32 Keps nuts. See Fig. F.  Verify door opens in desired 

direction

Figure F: Installing Dead Front Cover

Install trim and dead-front cover as one assembly using qty 

4 ¼-20 X 0.75” screws.

Figure G: Installing Dead Front Trim Assembly

Install directory cardholder, and Latch. Trim number strip to 

the appropriate length and install on Deadfront cover.

Figure H: Installing Directory Card Holder, Latch, and Number Strip

Transfer all pertinent information from the old directory card 

to the new card and insert in holder.

Содержание P1RX 240Vac Max

Страница 1: ...Pow R Line X Retrofit Panelboards Instruction Manual MN014011EN Effective January 2020 P1RX 240Vac Max P2RX 347 600Vac Max...

Страница 2: ......

Страница 3: ...1EN January 2020 eatoncanada ca Table of Content Installation Criteria 2 Safety Measures 3 Pre Installation Receiving Handling and Storage 4 Removal of Existing Panelboard Interior 4 Installation of R...

Страница 4: ...2 1067 Lug 24 400 48 1219 20 0 508 5 75 127 30 42 Table 2 P2RXL P2RXB Panelboards Main Device Circuits Current Amperes Minimum Height in mm Minimum Width in mm Minimum Depth in mm Lug 18 100 19 5 495...

Страница 5: ...ade all reasonable efforts to ensure that the instructions in this document are adequate and free of material errors and omissions Eaton will if necessary explain issues which may not be covered by th...

Страница 6: ...TALL AND OR SERVICE THIS EQUIPMENT Removal of Existing Panelboard Interior DO NOT work on electrical equipment while energized Verify power entering the equipment is de energized at the source Follow...

Страница 7: ...maintained per NECTM CECTM Care must be taken to ensure that the trim will completely cover openings in the enclosure If not using existing mounting hardware mark minimum of 8 mounting locations on th...

Страница 8: ...conductor into lug so the bare conductor fills the full length of the lug body Tighten lug then torque to levels indicated on the panelboard label If compression lugs are utilized and supplied with th...

Страница 9: ...uire ground fault protection for this installation Other GFP applications may be used including multi level ground fault protection Refer to the panelboard drawings and electrical construction drawing...

Страница 10: ...trim parts on the panelboard using hardware supplied by the manufacturer Take caution that conductors are not pinched between parts when installing the dead front cover and trim All parts should be al...

Страница 11: ...e all control power fusing and connections to products which will be damaged in this test This includes all components with control wire fusing Transient Voltage Surge Suppression Surge Protective Dev...

Страница 12: ...o maintain the equipment in satisfactory condition Maintain a permanent record of all maintenance activities and testing for future reference The condition of each panelboard should be recorded as a g...

Страница 13: ...RE ENERGIZE PANELBOARD After the panelboard has completely dried remove all materials and tools from the equipment Inspect all connections for damage and torque Re install all covers fillers dead fro...

Страница 14: ...le 4 Wire Bending Space Requirements for Cable Sizes Bolt Size Torque inch pounds Torque foot pounds Torque Newton Meters 10 30 2 5 3 4 65 5 4 7 3 5 16 130 10 8 14 7 3 8 240 20 27 1 600 50 67 8 Nation...

Страница 15: ...11 Pow R Line X Retrofit Panelboards Pow R Line X Retrofit Panelboards MN014011EN January 2020 eatoncanada ca Notes...

Страница 16: ...evard Cleveland OH 44122 United States Eaton com 2020 Eaton All Rights Reserved Printed in USA Publication No MN014011EN January 2020 Eaton is a registered trademark All trademarks are property of the...

Отзывы: