60
Eaton 93PM Integrated Battery Cabinet (IBC-L, IBC-LH [432V], and IBC-LH [480V]) Installation Manual 164000228—Rev 08
9.
Connect the thermal sensor interface wiring to the IBC thermal sensor interface terminals. See paragraph
and
for termination requirements.
For a detailed view of the IBC terminal block, see
or
.
10. Connect the thermal sensor interface wiring to the UPS thermal sensor interface (building alarm) terminals.
Refer to the applicable Eaton 93PM UPS Installation and Operation manual listed in paragraph
, for UPS cabinet termination requirements.
NOTE
In the following step, if the safety shield cannot be reinstalled because of misalignment,
use the leveling feet to realign the cabinet.
11. Reinstall the internal safety shield panel removed in
of paragraph
Line-Up-and-Match Power Wiring
12. Close the outside door and secure the latch.
13. If removed, reinstall the sidecar internal safety shield panel and secure with the retained hardware.
14. If removed, reinstall the sidecar front panel and secure with the retained hardware.
15. Once the battery cabinets are installed and wired, return to the applicable Eaton 93PM UPS Installation and
Operation manual, listed in paragraph
, to complete the UPS wiring.
44..66
IInniittiiaall S
Sttaarrttuupp
Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms specified in
become void. This service is offered as part of the sales
contract for the UPS. Contact an Eaton service representative in advance (a minimum two-week notice is
required) to reserve a preferred startup date.
44..77
C
Coom
mpplleettiinngg tthhee IInnssttaallllaattiioonn C
Chheecckklliisstt
The final step in installing the IBC is completing the following Installation Checklist. This checklist ensures that
you have completely installed all hardware, cables, and other equipment. Complete all items listed on the
checklist to ensure a smooth installation. Make a copy of the Installation Checklist before filling it out, and
retain the original.
After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS
system and commission it to support the critical load. The service representative cannot perform any
installation tasks other than verifying software and operating setup parameters. Service personnel may request
a copy of the completed Installation Checklist to verify all applicable equipment installations have been
completed.
NOTE
The Installation Checklist MUST be completed prior to starting the UPS system for the
first time.
Содержание IBC-L
Страница 86: ...16400022808 164000228 08 ...